[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1170469":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1170469,834,1,"单选题","施工单位填写的通水试验记录应一式（）份。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","二",false,{"key":16,"text":17,"correct":18},"B","三",true,{"key":20,"text":21,"correct":14},"C","四",{"key":23,"text":24,"correct":14},"D","五","③注意事项:通水试验为系统试验，-一般在系统完成后统一-进行。施工单位填写的通水试验记录应一式三份，并应由建设单位、监理单位、施工单位各保存一一份。通水试验记录宜采用表3-75的格式。",{"id":6,"name":27,"category":28,"favorite":29},"(资料员)专业管理实务 岗位知识","建筑工程",0]