[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1170384":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1170384,834,1,"单选题","为了保障施工资料的信息安全，采用计算管理施工资料的单位和部门从组织制度上采取的措施是（）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","计算机房应有出人管理制度",false,{"key":16,"text":17,"correct":18},"B","有应对突发事件的预案",true,{"key":20,"text":21,"correct":14},"C","内部局域网与外部互联网要进行物理隔离",{"key":23,"text":24,"correct":14},"D","计算机应安装杀毒软件","应对突发事件的预案是为了保障施工资料的信息安全，采用计算管理施工资料的单位和部门从组织制度上采取的措施。",{"id":6,"name":27,"category":28,"favorite":29},"(资料员)专业管理实务 岗位知识","建筑工程",0]