[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1170351":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1170351,834,1,"单选题","建筑物使用阶段的沉降观测次数，应视地基土类型和沉降速度大小而定，除有特殊要求者外，一般情况下可在第一年观测（）次。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","1",false,{"key":16,"text":17,"correct":14},"B","2",{"key":19,"text":20,"correct":14},"C","2～3",{"key":22,"text":23,"correct":24},"D","3～4",true,"建筑物使用阶段的沉降观测次数，应视地基土类型和沉降速度大小而定，除有特殊要求者外，一般情况下可在第一年观测3～4次。",{"id":6,"name":27,"category":28,"favorite":29},"(资料员)专业管理实务 岗位知识","建筑工程",0]