[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1170339":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1170339,834,1,"单选题","编制各施工班组的月进度计划表是（）的资料管理职责。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","项目经理",false,{"key":16,"text":17,"correct":14},"B","项目技术负责人",{"key":19,"text":20,"correct":21},"C","专业施工员",true,{"key":23,"text":24,"correct":14},"D","项目专业质量员","专业施工员：编制工程总进度计划表和月进度计划表及各施工班组的月进度表。",{"id":6,"name":27,"category":28,"favorite":29},"(资料员)专业管理实务 岗位知识","建筑工程",0]