[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1170261":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1170261,834,1,"单选题","施工文档资料管理计划由施工单位（），编制完成。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","签订施工合同之后，开工前",true,{"key":16,"text":17,"correct":18},"B","签订施工合同之前",false,{"key":20,"text":21,"correct":18},"C","开工前",{"key":23,"text":24,"correct":18},"D","开工后","施工文档资料管理计划由施工单位签订施工合同之后，开工前，编制完成。",{"id":6,"name":27,"category":28,"favorite":29},"(资料员)专业管理实务 岗位知识","建筑工程",0]