[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1170225":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1170225,834,1,"单选题","施工文件排列顺序应是施工管理文件、（）、进度造价文件、施工物资出厂质量证明及进厂检测文件。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工记录文件",false,{"key":16,"text":17,"correct":18},"B","施工技术文件",true,{"key":20,"text":21,"correct":14},"C","施工质量验收文件",{"key":23,"text":24,"correct":14},"D","施工验收文件","施工文件排列顺序应是施工管理文件、施工技术文件、进度造价文件、施工物资出厂质量证明及进厂检测文件。",{"id":6,"name":27,"category":28,"favorite":29},"(资料员)专业管理实务 岗位知识","建筑工程",0]