[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1170204":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1170204,834,1,"单选题","施工文件排列顺序应是施工记录文件、施工试验记录及检测文件（）、施工验收文件。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工管理文件",false,{"key":16,"text":17,"correct":14},"B","施工技术文件",{"key":19,"text":20,"correct":21},"C","施工质量验收文件",true,{"key":23,"text":24,"correct":14},"D","进度造价文件","施工文件排列顺序应是施工记录文件、施工试验记录及检测文件施工质量验收文件、施工验收文件。",{"id":6,"name":27,"category":28,"favorite":29},"(资料员)专业管理实务 岗位知识","建筑工程",0]