[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-833-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":606},{"id":5,"name":6,"category":7,"favorite":8},833,"(资料员)基础知识","建筑工程",0,4,50,1192,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,201,213,225,237,249,261,273,282,294,306,318,330,342,353,365,377,389,397,407,419,428,440,452,464,476,486,498,510,522,534,546,558,570,582,594],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1169081,1,"单选题","施工项目成本控制的措施是（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","组织措施、技术措施、经济措施",true,{"key":24,"text":25,"correct":26},"B","控制人工费用、控制材料费、控制机械费用、控制间接费及其他直接费",false,{"key":28,"text":29,"correct":26},"C","组织措施、制度措施、管理措施",{"key":31,"text":32,"correct":26},"D","管理措施、技术措施、人力措施","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1169082,"下列选项中，不属于施工项目目标控制问题的要素的是（）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"施工项目",{"key":24,"text":41,"correct":26},"控制主体",{"key":28,"text":43,"correct":26},"纠偏措施",{"key":31,"text":45,"correct":22},"排除干扰",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1169083,"下列不属于项目特性的是（）",[50,52,54,56],{"key":20,"text":51,"correct":26},"项目的单件性",{"key":24,"text":53,"correct":26},"项目具有一定的约束条件",{"key":28,"text":55,"correct":26},"项目具有特定的生命周期",{"key":31,"text":57,"correct":22},"项目的临时性",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1169084,"下列适用于小型的、专业性强，不需涉及众多部门的施工项目的组织结构形式是（）",[62,64,66,68],{"key":20,"text":63,"correct":26},"工作队式",{"key":24,"text":65,"correct":22},"部门控制式",{"key":28,"text":67,"correct":26},"直线式",{"key":31,"text":69,"correct":26},"矩阵式",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1169085,"下列关于施工项目管理组织的形式的说法中，错误的是（）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"工作队式项目组织适用于大型项目，工期要求紧，要求多工种、多部门配合的项目",{"key":24,"text":77,"correct":26},"事业部式适用于大型经营型企业的工程承包",{"key":28,"text":79,"correct":22},"部门控制式项目组织一般适用于专业性强的大中型项目",{"key":31,"text":81,"correct":26},"矩阵制项目组织适用于同时承担多个需要进行项目管理工程的企业",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1169087,"以下关于施工项目目标控制的表述，错误的是（）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"施工项目目标控制问题的要素包括施工项目、控制目标、控制主体、实施计划、实施信息、偏差数据、纠偏措施、纠偏行为",{"key":24,"text":89,"correct":26},"施工项目控制的目的是排除干扰、实现合同目标",{"key":28,"text":91,"correct":26},"施工项目目标控制是实现施工目标的手段",{"key":31,"text":93,"correct":22},"施工项目目标控制包括进度控制、质量控制和成本控制三个方面",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1169088,"以下关于施工项目管理组织形式的表述，错误的是（）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"施工项目管理组织的形式是指在施工项目管理组织中处理管理层次、管理跨度、部门设置和上下级关系的组织结构的类型",{"key":24,"text":101,"correct":26},"施工项目主要的管理组织形式有工作队式、部门控制式、矩阵制式、事业部制式等",{"key":28,"text":103,"correct":22},"部门控制式项目组织是指主要由企业中有关部门抽出管理力量组成施工项目经理部的方式",{"key":31,"text":105,"correct":26},"在施工项目实施过程中，应进行组织协调、沟通和处理好内部及外部的各种关系，排除各种干扰和障碍",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1169089,"背景材料：某学校新建五层框架结构教学楼工程，采用公开招标的方式选定A公司作为施工总承包，施工合同中双方约定钢筋、混凝土等主材由业主供应。A施工企业组建了施工项目经理部，任命李××为项目经理，且采用了直线式的组织形式。本工程在项目部全体人员的努力下，在合同规定的时间内完工，完成了施工项目的管理目标，但在施工过程中发生下列意外事件：事件1：钢材进场时，业主指令A公司验证人库，钢材供应单位在A公司质检员的见证下送检，检测结论合格。后监理项目部对现场钢筋质量产生疑问，要求重新检测，重新检测结论为不合格。事件2：A公司主体结构完成后，在拆除脚手架的过程中，一新架子工在三层楼面将几只扣件向下抛掷，一在下行走的瓦工安全帽被打落，头部被砸中，当场死亡。根据上述背景资料回答下列问题： 钢筋质量不合格导致的质量事故应由（）负责。",[110,112,114,116],{"key":20,"text":111,"correct":26},"A公司",{"key":24,"text":113,"correct":26},"检测机构",{"key":28,"text":115,"correct":26},"监理公司",{"key":31,"text":117,"correct":22},"某学校",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1169090,"施工项目经理部的性质可以概括为三个方面，即（）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"1综合性；2相对独立性；3临时性",{"key":24,"text":125,"correct":26},"1施工项目经理部是企业所属的经济组织；2施工项目经理部的管理职能是综合的；3施工项目经理部的管理业务是综合的",{"key":28,"text":127,"correct":26},"施工项目经理部同企业存在着行政隶属关系，要绝对服从企业的全面领导；2施工项目经理部是一个施工项目独立利益的代表，存在着独立的利益；3施工项目经理部负责施工项目从开工到竣工的全过程施工生产经营的管理",{"key":31,"text":129,"correct":26},"1施工项目经理部为项目经理决策提供信息依据，执行项目经理的决策意图，向项目经理全面负责；2项目经理部作为项目团队，应具有团队精神，完成企业所赋予的基本任务；3项目经理部是代表企业履行工程承包合同的主体，对项目产品和建设单位负责",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1169091,"施工项目经理部负责施工项目（）管理，对作业层负有管理与服务的双重双重职能。",[134,136,138,140],{"key":20,"text":135,"correct":22},"从开工到竣工阶段",{"key":24,"text":137,"correct":26},"从开工到工程保修阶段",{"key":28,"text":139,"correct":26},"从投标和签订合同到竣工阶段",{"key":31,"text":141,"correct":26},"从投标和签订合同到工程保修阶段",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1169092,"下列措施中，不属于施工项目安全控制的措施的是（）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"组织措施",{"key":24,"text":149,"correct":26},"技术措施",{"key":28,"text":151,"correct":22},"管理措施",{"key":31,"text":153,"correct":26},"制度措施",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1169093,"以下不属于施工资源管理任务的是（）。",[158,160,162,164],{"key":20,"text":159,"correct":26},"确定资源类型及数量",{"key":24,"text":161,"correct":22},"设计施工现场平面图",{"key":28,"text":163,"correct":26},"编制资源进度计划",{"key":31,"text":165,"correct":26},"施工资源进度计划的执行和动态凋整",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1169094,"下列性质中，不属于项目经理部的性质的是（）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"法律强制性",{"key":24,"text":173,"correct":26},"相对独立性",{"key":28,"text":175,"correct":26},"综合性",{"key":31,"text":177,"correct":26},"临时性",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1169095,"施工项目过程控制中，加强专项检查，包括自检、（）、互检。",[182,184,186,188],{"key":20,"text":183,"correct":22},"专检",{"key":24,"text":185,"correct":26},"全检",{"key":28,"text":187,"correct":26},"交接检",{"key":31,"text":189,"correct":26},"质检",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},1169096,"以下不属于施工项目现场管理的内容是（）",[194,196,197,199],{"key":20,"text":195,"correct":26},"规划及报批施工用地",{"key":24,"text":161,"correct":26},{"key":28,"text":198,"correct":26},"建立施工现场管理组织",{"key":31,"text":200,"correct":22},"为项目经理决策提供信息",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":28,"analysis":33},1169097,"下列选项中，不属于建立施工项目经理部的基本原则的是（）。",[205,207,209,211],{"key":20,"text":206,"correct":26},"根据所设计的项目组织形式设置",{"key":24,"text":208,"correct":26},"适应现场施工的需要",{"key":28,"text":210,"correct":22},"满足建设单位关于施工项目目标控制的要求",{"key":31,"text":212,"correct":26},"根据施工工程任务需要调整",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":31,"analysis":33},1169098,"施工项目的劳动组织不包括下列的（）。",[217,219,221,223],{"key":20,"text":218,"correct":26},"劳务输入",{"key":24,"text":220,"correct":26},"劳动力组织",{"key":28,"text":222,"correct":26},"项目经理部对劳务队伍的管理",{"key":31,"text":224,"correct":22},"劳务输出",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":31,"analysis":33},1169099,"下列属于技术工作要素的是（）",[229,231,233,235],{"key":20,"text":230,"correct":26},"技术计划",{"key":24,"text":232,"correct":26},"技术运用",{"key":28,"text":234,"correct":26},"技术评价",{"key":31,"text":236,"correct":22},"技术规程",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":24,"analysis":33},1169100,"施工人员在正式进行本班的工作前，必须对所用的机械装置和工具进行仔细的检查，下班前还必须进行班后检查，保证交接安全，此项工作属于（）",[241,243,245,247],{"key":20,"text":242,"correct":26},"专业性检查",{"key":24,"text":244,"correct":22},"日常性检查",{"key":28,"text":246,"correct":26},"节假日前后的检查",{"key":31,"text":248,"correct":26},"不定期检查",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":20,"analysis":33},1169101,"施工项目进度控制的措施主要有（）。",[253,255,257,259],{"key":20,"text":254,"correct":22},"组织措施、技术措施、合同措施、经济措施、信息管理措施等",{"key":24,"text":256,"correct":26},"管理措施、技术措施、经济措施等",{"key":28,"text":258,"correct":26},"行政措施、技术措施、经济措施等",{"key":31,"text":260,"correct":26},"政策措施、技术措施、经济措施等",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":28,"analysis":33},1169102,"下列各项措施中，不属于施工项目质量控制的措施的是（）。",[265,267,269,271],{"key":20,"text":266,"correct":26},"提高管理、施工及操作人员自身素质",{"key":24,"text":268,"correct":26},"提高施工的质量管理水平",{"key":28,"text":270,"correct":22},"尽可能采用先进的施工技术、方法和新材料、新工艺、新技术，保证进度目标实现",{"key":31,"text":272,"correct":26},"加强施工项目的过程控制",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":24,"analysis":33},1169103,"下列不属于施工资源管理任务的是（）",[277,278,279,280],{"key":20,"text":159,"correct":26},{"key":24,"text":161,"correct":22},{"key":28,"text":163,"correct":26},{"key":31,"text":281,"correct":26},"施工资源进度计划的执行和动态管理",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":24,"analysis":33},1169104,"在某工程施工过程中，通过各种因素分析，发现机械费用存在潜在问题，项目经理部及时调整了施工方案，这体现的是施工项目成本的（）。",[286,288,290,292],{"key":20,"text":287,"correct":26},"过程控制",{"key":24,"text":289,"correct":22},"事前控制",{"key":28,"text":291,"correct":26},"动态控制",{"key":31,"text":293,"correct":26},"全面控制",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":24,"analysis":33},1169105,"下面不属于施工项目管理特征的是（）",[298,300,302,304],{"key":20,"text":299,"correct":26},"施工项目管理要求强化组织协调工作",{"key":24,"text":301,"correct":22},"施工项目管理的对象是项目",{"key":28,"text":303,"correct":26},"施工项目管理的内容是按阶段变化的",{"key":31,"text":305,"correct":26},"施工项目的管理者是建筑施工企业",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":24,"analysis":33},1169106,"施工成本控制的步骤包括：①纠偏，②分析，③检查，④比较，⑤预测；正确的步骤顺序应为（）",[310,312,314,316],{"key":20,"text":311,"correct":26},"④③②①⑤",{"key":24,"text":313,"correct":22},"④②⑤①③",{"key":28,"text":315,"correct":26},"②③④①⑤",{"key":31,"text":317,"correct":26},"②④⑤①③",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":24,"analysis":33},1169107,"在施工成本控制的步骤中，控制工作的核心是（）",[322,324,326,328],{"key":20,"text":323,"correct":26},"预测估计完成项目所需的总费用",{"key":24,"text":325,"correct":22},"分析比较结果以确定偏差的严重性和原因",{"key":28,"text":327,"correct":26},"采取适当措施纠偏",{"key":31,"text":329,"correct":26},"检查纠偏措施的执行情况",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":20,"analysis":33},1169108,"背景材料：某学校新建五层框架结构教学楼工程，采用公开招标的方式选定A公司作为施工总承包，施工合同中双方约定钢筋、混凝土等主材由业主供应。A施工企业组建了施工项目经理部，任命李××为项目经理，且采用了直线式的组织形式。本工程在项目部全体人员的努力下，在合同规定的时间内完工，完成了施工项目的管理目标，但在施工过程中发生下列意外事件：事件1：钢材进场时，业主指令A公司验证人库，钢材供应单位在A公司质检员的见证下送检，检测结论合格。后监理项目部对现场钢筋质量产生疑问，要求重新检测，重新检测结论为不合格。事件2：A公司主体结构完成后，在拆除脚手架的过程中，一新架子工在三层楼面将几只扣件向下抛掷，一在下行走的瓦工安全帽被打落，头部被砸中，当场死亡。根据上述背景资料回答下列问题： 关于直线组织结构说法不正确的是（）。",[334,336,338,340],{"key":20,"text":335,"correct":22},"具有双重领导",{"key":24,"text":337,"correct":26},"结构简单",{"key":28,"text":339,"correct":26},"要求项目经理是全能式的人才",{"key":31,"text":341,"correct":26},"适用于小型项目",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":24,"analysis":33},1169109,"下列选项中，不属于施工项目管理组织的主要形式的是（）。",[346,347,349,351],{"key":20,"text":63,"correct":26},{"key":24,"text":348,"correct":22},"线性结构式",{"key":28,"text":350,"correct":26},"矩阵制式",{"key":31,"text":352,"correct":26},"事业部制式",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":31,"analysis":33},1169110,"对（）的控制，尤其是施工方案的正确选择，是直接影响施工项目的进度控制、质量控制和投资控制三大目标能否顺利实现的关键。",[357,359,361,363],{"key":20,"text":358,"correct":26},"人",{"key":24,"text":360,"correct":26},"材料",{"key":28,"text":362,"correct":26},"机械设备",{"key":31,"text":364,"correct":22},"工艺方法",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":28,"analysis":33},1169111,"影响施工项目质量的环境因素较多，（）不是影响质量的主要环境因素。",[369,371,373,375],{"key":20,"text":370,"correct":26},"工程技术环境",{"key":24,"text":372,"correct":26},"工程管理环境",{"key":28,"text":374,"correct":22},"融资环境",{"key":31,"text":376,"correct":26},"劳动环境",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":28,"analysis":33},1169112,"施工项目管理的目标是（）",[381,383,385,387],{"key":20,"text":382,"correct":26},"施工的效率目标，施工的环境目标，施工的安全目标",{"key":24,"text":384,"correct":26},"施工的成本目标，施工的环境目标，施工的安全目标",{"key":28,"text":386,"correct":22},"施工的质量目标，施工的进度目标，施工的成本目标",{"key":31,"text":388,"correct":26},"施工的安全目标，施工的进度目标，施工的环境目标",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":20,"analysis":33},1169113,"影响施工项目质量的第一个重要因素是（）",[393,394,395,396],{"key":20,"text":358,"correct":22},{"key":24,"text":360,"correct":26},{"key":28,"text":362,"correct":26},{"key":31,"text":364,"correct":26},{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":31,"analysis":33},1169114,"以下不属于施工项目生产要素的是（）",[401,403,404,405],{"key":20,"text":402,"correct":26},"劳动力",{"key":24,"text":360,"correct":26},{"key":28,"text":362,"correct":26},{"key":31,"text":406,"correct":22},"施工现场",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":31,"analysis":33},1169115,"组织协调的主要目的是（）",[411,413,415,417],{"key":20,"text":412,"correct":26},"加快施工进度",{"key":24,"text":414,"correct":26},"提高施工质量",{"key":28,"text":416,"correct":26},"降低施工成本",{"key":31,"text":418,"correct":22},"保证项目目标的实现",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":31,"analysis":33},1169116,"为了取得施工成本管理的理想效果，必须从多方面采取有效措施实施管理，这些措施不包括（）。",[423,424,425,427],{"key":20,"text":147,"correct":26},{"key":24,"text":149,"correct":26},{"key":28,"text":426,"correct":26},"经济措施",{"key":31,"text":151,"correct":22},{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":24,"analysis":33},1169117,"施工项目资金管理的重点是（）",[432,434,436,438],{"key":20,"text":433,"correct":26},"编制资金计划",{"key":24,"text":435,"correct":22},"收入与支出",{"key":28,"text":437,"correct":26},"筹集资金",{"key":31,"text":439,"correct":26},"资金使用",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":24,"analysis":33},1169118,"施工项目目标控制包括：施工项目进度控制、施工项目质量控制、（）、施工项目安全控制四个方面。",[444,446,448,450],{"key":20,"text":445,"correct":26},"施工项目管理控制",{"key":24,"text":447,"correct":22},"施工项目成本控制",{"key":28,"text":449,"correct":26},"施工项目人力控制",{"key":31,"text":451,"correct":26},"施工项目物资控制",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":28,"analysis":33},1169119,"在质量管理的PDCA循环中，计划行动方案的交底和按计划规定的方法和要求开展工程作业技术活动属于（）",[456,458,460,462],{"key":20,"text":457,"correct":26},"计划",{"key":24,"text":459,"correct":26},"检查",{"key":28,"text":461,"correct":22},"实施",{"key":31,"text":463,"correct":26},"处置",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":24,"analysis":33},1169120,"下列选项中关于施工项目管理的特点说法有误的是（）。",[468,470,472,474],{"key":20,"text":469,"correct":26},"对象是施工项目",{"key":24,"text":471,"correct":22},"主体是建设单位",{"key":28,"text":473,"correct":26},"内容是按阶段变化的",{"key":31,"text":475,"correct":26},"要求强化组织协调工作",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":28,"analysis":33},1169121,"下列属于技术活动过程的是（）",[480,482,484,485],{"key":20,"text":481,"correct":26},"技术装备",{"key":24,"text":483,"correct":26},"技术资料",{"key":28,"text":234,"correct":22},{"key":31,"text":236,"correct":26},{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":28,"analysis":33},1169122,"下列措施中，不属于施工准备阶段的安全技术措施的是（）。",[490,492,494,496],{"key":20,"text":491,"correct":26},"技术准备",{"key":24,"text":493,"correct":26},"物资准备",{"key":28,"text":495,"correct":22},"资金准备",{"key":31,"text":497,"correct":26},"施工队伍准备",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":24,"analysis":33},1169123,"施工质量保证体系运行的PDCA循环原理是（）",[502,504,506,508],{"key":20,"text":503,"correct":26},"计划、检查、实施、处理",{"key":24,"text":505,"correct":22},"计划、实施、检查、处理",{"key":28,"text":507,"correct":26},"检查、计划、实施、处理",{"key":31,"text":509,"correct":26},"检查、计划、处理、实施",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":24,"analysis":33},1169124,"下列（）不属于施工项目经理部的工作内容。",[514,516,518,520],{"key":20,"text":515,"correct":26},"对进人项目的资源和生产要素进行优化配置和动态管理",{"key":24,"text":517,"correct":22},"在项目经理的领导下制定项目管理实施规划和企业管理的各项规章制度",{"key":28,"text":519,"correct":26},"有效控制项目的工期、质量、成本和安全等目标",{"key":31,"text":521,"correct":26},"增进项目有关部门之间的沟通，提高工作效率",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":31,"analysis":33},1169125,"以下不属于施工项目管理内容的是（）。",[526,528,530,532],{"key":20,"text":527,"correct":26},"施工项目的生产要素管理",{"key":24,"text":529,"correct":26},"组织协调",{"key":28,"text":531,"correct":26},"施工现场的管理",{"key":31,"text":533,"correct":22},"项目的规划设计",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":20,"analysis":33},1169126,"下列施工项目管理程序的排序正确的是（）。",[538,540,542,544],{"key":20,"text":539,"correct":22},"投标、签订合同→施工准备→施工→验收交工与结算→用后服务",{"key":24,"text":541,"correct":26},"施工准备→投标、签订合同→施工→验收交工与结算→用后服务",{"key":28,"text":543,"correct":26},"投标、签订合同→施工→施工准备→验收交工与结算→用后服务",{"key":31,"text":545,"correct":26},"投标、签订合同→施工准备→施工→验收交工→用后服务与结算",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":24,"analysis":33},1169127,"吸水井的容积应大于最大一台水泵（）的出水量。",[550,552,554,556],{"key":20,"text":551,"correct":26},"1min",{"key":24,"text":553,"correct":22},"3min",{"key":28,"text":555,"correct":26},"5min",{"key":31,"text":557,"correct":26},"10min",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":31,"analysis":33},1169128,"下列（）属于大型性建筑。",[562,564,566,568],{"key":20,"text":563,"correct":26},"住宅小区",{"key":24,"text":565,"correct":26},"学校",{"key":28,"text":567,"correct":26},"医院",{"key":31,"text":569,"correct":22},"航空港",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":28,"analysis":33},1169129,"当浅层地基上不能满足建筑物对地基承载力和变形要求，又不适宜采取地基处理措施时，可以选用（）",[574,576,578,580],{"key":20,"text":575,"correct":26},"独立基础",{"key":24,"text":577,"correct":26},"条形基础",{"key":28,"text":579,"correct":22},"桩基础",{"key":31,"text":581,"correct":26},"井格基础",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":28,"analysis":33},1169130,"普通焊接钢管用于输送流体工作压力小于或等于（）的管路。",[586,588,590,592],{"key":20,"text":587,"correct":26},"0.8MPa",{"key":24,"text":589,"correct":26},"0.9MPa",{"key":28,"text":591,"correct":22},"1.0MPa",{"key":31,"text":593,"correct":26},"1.1MPa",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":24,"analysis":33},1169131,"我国大部分标准窗的尺寸均采用（）的扩大模数。",[598,600,602,604],{"key":20,"text":599,"correct":26},"2M",{"key":24,"text":601,"correct":22},"3M",{"key":28,"text":603,"correct":26},"4M",{"key":31,"text":605,"correct":26},"5M",[607,610,613,616,619,622],{"id":15,"name":608,"category":7,"favorite":609},"领导干部任职前廉政法规知识测试题",92,{"id":611,"name":612,"category":7,"favorite":15},595,"建筑结构与设备",{"id":614,"name":615,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":617,"name":618,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":620,"name":621,"category":7,"favorite":8},534,"BIM工程师",{"id":623,"name":621,"category":7,"favorite":8},535]