[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-833-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":604},{"id":5,"name":6,"category":7,"favorite":8},833,"(资料员)基础知识","建筑工程",0,3,50,1192,[13,34,46,58,70,82,94,103,115,127,139,151,163,175,184,196,204,216,228,240,252,264,276,287,299,311,322,333,345,357,369,381,393,405,417,429,437,449,461,473,485,497,509,521,532,544,556,568,580,592],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1169031,1,"单选题","砖墙墙身砌筑高度超过（）m时，应搭设脚手架，架上堆放材料不得超过规定荷载标准值。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","0.8",false,{"key":24,"text":25,"correct":26},"B","1.2",true,{"key":28,"text":29,"correct":22},"C","1.8",{"key":31,"text":32,"correct":22},"D","2.0","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1169032,"浇筑混凝土竖向结构（墙、柱），应是混凝土自由倾落高度一般不宜超过2M，竖向结构不得超过（）M，竖向结构否则，应采用串筒、溜槽或振动节管下料。",[38,40,42,44],{"key":20,"text":39,"correct":22},"2",{"key":24,"text":41,"correct":22},"4",{"key":28,"text":43,"correct":22},"6",{"key":31,"text":45,"correct":26},"3",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1169033,"砖砌体的施工工艺过程正确是的（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"找平、放线、摆砖样、盘角、立皮数杆、砌筑、勾缝、清理、楼层标高控制、楼层轴线标引等",{"key":24,"text":53,"correct":26},"找平、放线、摆砖样、立皮数杆、盘角、砌筑、清理、勾缝、楼层轴线标引、楼层标高控制等",{"key":28,"text":55,"correct":22},"找平、放线、摆砖样、立皮数杆、盘角、砌筑、勾缝、清理、楼层轴线标引、楼层标高控制等",{"key":31,"text":57,"correct":22},"找平、放线、立皮数杆、摆砖样、盘角、挂线、砌筑、勾缝、清理、楼层标高控制、楼层轴线标引等",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1169034,"下列模板，属于工具式模板的是（）",[62,64,66,68],{"key":20,"text":63,"correct":22},"钢木组合模板",{"key":24,"text":65,"correct":22},"胶合板模板",{"key":28,"text":67,"correct":26},"滑动模板",{"key":31,"text":69,"correct":22},"玻璃钢模板",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1169035,"钢结构连接方法中，（）连接构造简单、加工方便、节约钢材、易于自动化施工，但对疲劳较敏感。",[74,76,78,80],{"key":20,"text":75,"correct":22},"普通螺栓",{"key":24,"text":77,"correct":22},"高强螺栓",{"key":28,"text":79,"correct":26},"焊接",{"key":31,"text":81,"correct":22},"铆钉",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1169036,"可以充分利用地方资源和工业废料，改善墙体保温隔热性能，提高砌筑效率，降低墙体自重的砌体是（）",[86,88,90,92],{"key":20,"text":87,"correct":22},"砖砌体",{"key":24,"text":89,"correct":22},"石砌体",{"key":28,"text":91,"correct":26},"砌块砌体",{"key":31,"text":93,"correct":22},"配筋砌体",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1169037,"较大面积人工回填用打夯机夯实时，两机平行其间距不得小于（）。",[98,99,100,102],{"key":20,"text":45,"correct":26},{"key":24,"text":41,"correct":22},{"key":28,"text":101,"correct":22},"5",{"key":31,"text":43,"correct":22},{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":24,"analysis":33},1169038,"设置隔离层的防水屋面是（）",[107,109,111,113],{"key":20,"text":108,"correct":22},"卷材防水屋面",{"key":24,"text":110,"correct":26},"刚性防水屋面",{"key":28,"text":112,"correct":22},"涂膜防水屋面",{"key":31,"text":114,"correct":22},"瓦屋面",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":20,"analysis":33},1169039,"有主次梁的楼板，混凝土宜顺次梁方向浇筑，施工缝应留在次梁跨度（）范围内。",[119,121,123,125],{"key":20,"text":120,"correct":26},"中间1\u002F3",{"key":24,"text":122,"correct":22},"中间1\u002F2",{"key":28,"text":124,"correct":22},"两端1\u002F4",{"key":31,"text":126,"correct":22},"两端1\u002F3",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":31,"analysis":33},1169040,"下列关于基坑支护的表述中，有误的是（）。",[131,133,135,137],{"key":20,"text":132,"correct":22},"钢板桩支护具有施工速度快，可重复使用的特点",{"key":24,"text":134,"correct":22},"工程开挖土方时，地下连续墙可用作支护结构，既挡土又挡水，地下连续墙还可同时用作建筑物的承重结构",{"key":28,"text":136,"correct":22},"深层搅拌水泥土桩墙，采用水泥作为固化剂",{"key":31,"text":138,"correct":26},"常用的钢板桩施工机械有自由落锤、气动锤、柴油锤、振动锤，使用较多的是柴油锤",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":24,"analysis":33},1169041,"应在基坑(槽)四侧或两侧挖好临时排水沟和集水井，或采用井点降水，将水位降低至坑、槽底以下（）以利土方开挖。",[143,145,147,149],{"key":20,"text":144,"correct":22},"600mm",{"key":24,"text":146,"correct":26},"500mm",{"key":28,"text":148,"correct":22},"400mm",{"key":31,"text":150,"correct":22},"300mm",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":20,"analysis":33},1169042,"下列土，属于松软土的是（）",[155,157,159,161],{"key":20,"text":156,"correct":26},"粉土",{"key":24,"text":158,"correct":22},"干黄土",{"key":28,"text":160,"correct":22},"泥岩",{"key":31,"text":162,"correct":22},"填筑土",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":28,"analysis":33},1169043,"高强度螺栓的拧紧问题说法错误的是（）。",[167,169,171,173],{"key":20,"text":168,"correct":22},"高强度螺栓连接的拧紧应分为初拧、终拧",{"key":24,"text":170,"correct":22},"对于大型节点应分为初拧、复拧、终拧",{"key":28,"text":172,"correct":26},"复拧扭矩应当大于初拧扭矩",{"key":31,"text":174,"correct":22},"扭剪型高强度螺栓拧紧时对螺母施加顺时针力矩",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":20,"analysis":33},1169044,"背景材料：某民用建筑工程，地上18层，地下2层，地下室防水采用防水混凝土结构自防水，防水等级为二级。地下室混凝土强度等级为C25，水灰比为0.55，水的用量为190kg\u002Fm3。 防水混凝土当需设置后浇带时，后浇缝应设在受力和变形较小的部位，宽度以（）m为宜。",[179,181,182,183],{"key":20,"text":180,"correct":26},"1",{"key":24,"text":39,"correct":22},{"key":28,"text":45,"correct":22},{"key":31,"text":41,"correct":22},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":20,"analysis":33},1169045,"下列关于毛石砌体施工工艺的基本规定中，有误的是（）。",[188,190,192,194],{"key":20,"text":189,"correct":26},"毛石料和粗石料砌体的灰缝厚度不宜大于10mm，细石料砌体的灰缝厚度不宜小于10mm",{"key":24,"text":191,"correct":22},"施工工艺流程为：施工准备→试排撂底→砌筑毛石（同时搅拌砂浆）→勾缝→检验评定",{"key":28,"text":193,"correct":22},"每日砌筑高度不宜超过1.2m，在转角处及交接处应同时砌筑，如不能同时砌筑时，应留斜槎",{"key":31,"text":195,"correct":22},"毛石挡土墙一般按3～4皮为一个分层高度砌筑，每砌一个分层高度应找平一次",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":20,"analysis":33},1169046,"与梁的接触处待加气砖砌完（）星期后采用灰砂砖斜砌顶紧。",[200,201,202,203],{"key":20,"text":180,"correct":26},{"key":24,"text":39,"correct":22},{"key":28,"text":45,"correct":22},{"key":31,"text":41,"correct":22},{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":31,"analysis":33},1169047,"刚性防水屋面的刚性防水层应设置分隔缝，分格缝应设置在（）",[208,210,212,214],{"key":20,"text":209,"correct":22},"受剪力较小的位置",{"key":24,"text":211,"correct":22},"受轴力较小的位置",{"key":28,"text":213,"correct":22},"变形较小的位置",{"key":31,"text":215,"correct":26},"变形较大的位置",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":31,"analysis":33},1169048,"下列关于砌块砌体施工工艺的基本规定中，错误的是（）。",[220,222,224,226],{"key":20,"text":221,"correct":22},"灰缝厚度宜为15mm",{"key":24,"text":223,"correct":22},"灰缝要求横平竖直，水平灰缝应饱满，竖缝采用挤浆和加浆方法，严禁用水冲洗清理灌缝",{"key":28,"text":225,"correct":22},"在墙体底部，在砌第一皮加气砖前，应用实心砖砌筑，其高度宜不小于200mm",{"key":31,"text":227,"correct":26},"与梁的接触处待加气砖砌完14d后采用灰砂砖斜砌顶紧",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":24,"analysis":33},1169049,"下列关于基坑（槽）开挖施工工艺的说法中，正确的是（）。",[232,234,236,238],{"key":20,"text":233,"correct":22},"采用机械开挖基坑时，为避免破坏基底土，应在标高以上预留15～50cm的土层由人工挖掘修整",{"key":24,"text":235,"correct":26},"在基坑（槽）四侧或两侧挖好临时排水沟和集水井，或采用井点降水，将水位降低至坑、槽底以下500mm，以利于土方开挖",{"key":28,"text":237,"correct":22},"雨期施工时，基坑（槽）需全段开挖，尽快完成",{"key":31,"text":239,"correct":22},"当基坑挖好后不能立即进行下道工序时，应预留30cm的土不挖，待下道工序开始再挖至设计标高",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":20,"analysis":33},1169050,"角焊缝按两焊脚边的夹角分类，（）焊缝受力性能好，应用广泛。",[244,246,248,250],{"key":20,"text":245,"correct":26},"直角",{"key":24,"text":247,"correct":22},"钝角",{"key":28,"text":249,"correct":22},"锐角",{"key":31,"text":251,"correct":22},"45°角",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":28,"analysis":33},1169051,"下列各项中，关于常见模板的种类、特性的基本规定不正确的说法是（）。",[256,258,260,262],{"key":20,"text":257,"correct":22},"常见模板的种类有组合式模板、工具式模板两大类",{"key":24,"text":259,"correct":22},"爬升模板适用于现浇钢筋混凝土竖向（或倾斜）结构",{"key":28,"text":261,"correct":26},"飞模适用于小开间、小柱网、小进深的钢筋混凝土楼盖施工",{"key":31,"text":263,"correct":22},"组合式模板可事先按设计要求组拼成梁、柱、墙、楼板的大型模板，整体吊装就位，也可采用散支散拆方法",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":24,"analysis":33},1169052,"填方路堤，如基地为坡面，在处理时，当坡度在（）之间时，应将坡面做成台阶形。",[268,270,272,274],{"key":20,"text":269,"correct":22},"1:10~1:5",{"key":24,"text":271,"correct":26},"1:5~1:2.5",{"key":28,"text":273,"correct":22},"1:2.5~1:1",{"key":31,"text":275,"correct":22},"1:1~1:0.5",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":24,"analysis":33},1169053,"普通混凝土的自然养护时间不少于（）天。",[280,281,283,285],{"key":20,"text":39,"correct":22},{"key":24,"text":282,"correct":26},"7",{"key":28,"text":284,"correct":22},"12",{"key":31,"text":286,"correct":22},"14",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":31,"analysis":33},1169054,"广泛用于钢筋接头、钢筋骨架焊接，装配式结构接头的焊接，钢筋与钢板的焊接以及各种钢结构的焊接连接方法是（）",[291,293,295,297],{"key":20,"text":292,"correct":22},"电阻点焊",{"key":24,"text":294,"correct":22},"电渣压力焊",{"key":28,"text":296,"correct":22},"闪光对焊",{"key":31,"text":298,"correct":26},"电弧焊",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":24,"analysis":33},1169055,"按工程部位和用途，不是防水工程三大类的是（）。",[303,305,307,309],{"key":20,"text":304,"correct":22},"屋面防水工程",{"key":24,"text":306,"correct":26},"室外墙角防水工程",{"key":28,"text":308,"correct":22},"地下防水工程",{"key":31,"text":310,"correct":22},"楼地面防水工程",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":20,"analysis":33},1169056,"钢结构的连接方法不包括（）。",[315,317,318,320],{"key":20,"text":316,"correct":26},"绑扎连接",{"key":24,"text":79,"correct":22},{"key":28,"text":319,"correct":22},"螺栓连接",{"key":31,"text":321,"correct":22},"铆钉连接",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":31,"analysis":33},1169057,"下列模板不属于组合钢模板的是（）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"平面模板",{"key":24,"text":329,"correct":22},"阴角模板",{"key":28,"text":331,"correct":22},"阳角模板",{"key":31,"text":67,"correct":26},{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":31,"analysis":33},1169058,"施工测量是根据施工的要求，把设计好的建筑物和构筑物的（），按设计要求以一定的精度测设在地面上，并在施工过程中进行一系列测量工作，以衔接和指导各工序间的施工。",[337,339,341,343],{"key":20,"text":338,"correct":22},"平面位置",{"key":24,"text":340,"correct":22},"高程",{"key":28,"text":342,"correct":22},"标高",{"key":31,"text":344,"correct":26},"平面位置和高程",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":28,"analysis":33},1169059,"下列关于涂料防水施工工艺的说法中，错误的是（）。",[349,351,353,355],{"key":20,"text":350,"correct":22},"防水涂料防水层属于柔性防水层",{"key":24,"text":352,"correct":22},"一般采用外防外涂和外防内涂施工方法",{"key":28,"text":354,"correct":26},"其施工工艺流程为：找平层施工→保护层施工→防水层施工→质量检查",{"key":31,"text":356,"correct":22},"找平层有水泥砂浆找平层、沥青砂浆找平层、细石混凝土找平层三种",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":31,"analysis":33},1169060,"三类土又称为（）",[361,363,365,367],{"key":20,"text":362,"correct":22},"松软土",{"key":24,"text":364,"correct":22},"砂砾坚土",{"key":28,"text":366,"correct":22},"软石",{"key":31,"text":368,"correct":26},"坚土",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":24,"analysis":33},1169061,"立皮数杆的主要目的是砌墙时控制砌体的（），同时控制砖的层数和灰缝水平。",[373,375,377,379],{"key":20,"text":374,"correct":22},"水平尺寸",{"key":24,"text":376,"correct":26},"竖向尺寸",{"key":28,"text":378,"correct":22},"垂直度",{"key":31,"text":380,"correct":22},"平整度",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":31,"analysis":33},1169062,"浇筑竖向结构混凝土前，应先在底部浇筑一层水泥砂浆，对砂浆的要求是（）。",[385,387,389,391],{"key":20,"text":386,"correct":22},"与混凝土内砂浆成分相同且强度高一级",{"key":24,"text":388,"correct":22},"与混凝土内砂浆成分不同且强度高一级",{"key":28,"text":390,"correct":22},"与混凝土内砂浆成分不同",{"key":31,"text":392,"correct":26},"与混凝土内砂浆成分相同",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":24,"analysis":33},1169063,"下列关于掺防水剂水泥砂浆防水施工的说法中，错误的是（）。",[397,399,401,403],{"key":20,"text":398,"correct":22},"施工工艺流程为：找平层施工→防水层施工→质量检查",{"key":24,"text":400,"correct":26},"当施工采用抹压法时，先在基层涂刷一层1:0.4的水泥浆，随后分层铺抹防水砂浆，每层厚度为10～15mm，总厚度不小于30mm",{"key":28,"text":402,"correct":22},"氯化铁防水砂浆施工时，底层防水砂浆抹完12h后，抹压面层防水砂浆，其厚13mm分两遍抹压",{"key":31,"text":404,"correct":22},"防水层施工时的环境温度为5～35℃",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":20,"analysis":33},1169064,"下列关于防水工程的说法中，不正确的是（）。",[409,411,413,415],{"key":20,"text":410,"correct":26},"防水混凝土多采用较大的水灰比，降低水泥用量和砂率，选用较小的骨料直径",{"key":24,"text":412,"correct":22},"根据所用材料不同，防水工程可分为柔性防水和刚性防水",{"key":28,"text":414,"correct":22},"按工程部位和用途，防水工程又可分为屋面防水工程、地下防水工程、楼地面防水工程",{"key":31,"text":416,"correct":22},"防水砂浆防水通过增加防水层厚度和提高砂浆层的密实性来达到防水要求",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":20,"analysis":33},1169065,"下列关于防水砂浆防水层施工的说法中，正确的是（）。",[421,423,425,427],{"key":20,"text":422,"correct":26},"砂浆防水工程是利用一定配合比的水泥浆和水泥砂浆（称防水砂浆）分层分次施工，相互交替抹压密实的封闭防水整体",{"key":24,"text":424,"correct":22},"防水砂浆防水层的背水面基层的防水层采用五层做法，迎水面基层的防水层采用四层做法",{"key":28,"text":426,"correct":22},"防水层每层应连续施工，素灰层与砂浆层可不在同一天施工完毕",{"key":31,"text":428,"correct":22},"揉浆是使水泥砂浆素灰相互渗透结合牢固，既保护素灰层又起到防水作用，当揉浆难时，允许加水稀释",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":31,"analysis":33},1169066,"主要适用于钢筋的交叉连接如焊接钢筋网片，钢筋骨架的焊接连接方法是（）",[433,434,435,436],{"key":20,"text":298,"correct":22},{"key":24,"text":296,"correct":22},{"key":28,"text":294,"correct":22},{"key":31,"text":292,"correct":26},{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":20,"analysis":33},1169067,"混凝土浇水养护的时间：对采用硅酸盐水泥、普通硅酸盐水泥或矿渣硅酸盐水泥拌制的混凝土，不得少于（）。",[441,443,445,447],{"key":20,"text":442,"correct":26},"7d",{"key":24,"text":444,"correct":22},"10d",{"key":28,"text":446,"correct":22},"5d",{"key":31,"text":448,"correct":22},"14d",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":31,"analysis":33},1169068,"下列各项中，关于钢筋连接的基本规定不正确的说法是（）。",[453,455,457,459],{"key":20,"text":454,"correct":22},"钢筋的连接可分为绑扎连接、焊接和机械连接三种",{"key":24,"text":456,"correct":22},"在任何情况下，纵向受拉钢筋绑扎搭接接头的搭设长度不应小于300mm，纵向受压钢筋的搭接长度不应小于200mm",{"key":28,"text":458,"correct":22},"钢筋机械连接有钢筋套筒挤压连接、钢筋锥螺纹套筒连接、钢筋镦粗直螺纹套筒连接、钢筋滚压直螺纹套筒连接",{"key":31,"text":460,"correct":26},"当受拉钢筋的直径d>22mm及受压钢筋的直径d>25mm时，不宜采用绑扎搭接接头",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":28,"analysis":33},1169069,"高强度螺栓施工时，对每一个连接接头，应先用临时螺栓和冲钉定位，临时螺栓和冲钉的数量应由计算确定，但不少于安装孔的（）。",[465,467,469,471],{"key":20,"text":466,"correct":22},"2\u002F3",{"key":24,"text":468,"correct":22},"1\u002F2",{"key":28,"text":470,"correct":26},"1\u002F3",{"key":31,"text":472,"correct":22},"1\u002F4",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":24,"analysis":33},1169070,"浇筑应连续作业，在竖向结构中如浇灌高度超过（）时，应采用溜槽或串筒下料。",[477,479,481,483],{"key":20,"text":478,"correct":22},"2m",{"key":24,"text":480,"correct":26},"3m",{"key":28,"text":482,"correct":22},"3.5m",{"key":31,"text":484,"correct":22},"4m",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":31,"analysis":33},1169071,"下列各项中，关于混凝土拌合料运输过程中一般要求不正确的说法是（）。",[489,491,493,495],{"key":20,"text":490,"correct":22},"保持其均匀性，不离析、不漏浆",{"key":24,"text":492,"correct":22},"保证混凝土浇筑能连续进行",{"key":28,"text":494,"correct":22},"运到浇筑地点时应具有设计配合比所规定的坍落度",{"key":31,"text":496,"correct":26},"应在混凝土终凝前浇入模板并捣实完毕",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":31,"analysis":33},1169072,"下列按砌筑主体不同分类的砌体工程中，不符合的是（）。",[501,503,505,507],{"key":20,"text":502,"correct":22},"砖砌体工程",{"key":24,"text":504,"correct":22},"砌块砌体工程",{"key":28,"text":506,"correct":22},"石砌体工程",{"key":31,"text":508,"correct":26},"混凝土砌体工程",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":31,"analysis":33},1169073,"不属于常用的钢板桩的是（）。",[513,515,517,519],{"key":20,"text":514,"correct":22},"U型",{"key":24,"text":516,"correct":22},"Z型",{"key":28,"text":518,"correct":22},"直腹板式",{"key":31,"text":520,"correct":26},"非组合式钢板桩",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":24,"analysis":33},1169074,"下列焊接方法中，不属于钢结构工程常用的是（）。",[525,527,528,530],{"key":20,"text":526,"correct":22},"自动（半自动）埋弧焊",{"key":24,"text":296,"correct":26},{"key":28,"text":529,"correct":22},"药皮焊条手工电弧焊",{"key":31,"text":531,"correct":22},"气体保护焊",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":28,"analysis":33},1169075,"下列关于钢结构安装施工要点的说法中，正确的是（）。",[536,538,540,542],{"key":20,"text":537,"correct":22},"钢构件拼装前应检查清除飞边、毛刺、焊接飞溅物，摩擦面应保持干燥、整洁，采取相应防护措施后，可在雨中作业",{"key":24,"text":539,"correct":22},"螺栓应能自由穿入孔内，不能自由穿入时，可采用气割扩孔",{"key":28,"text":541,"correct":26},"起吊事先将钢构件吊离地面50cm左右，使钢构件中心对准安装位置中心",{"key":31,"text":543,"correct":22},"高强度螺栓可兼作安装螺栓",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":20,"analysis":33},1169076,"以下不属于施工项目质量控制措施的是（）。",[548,550,552,554],{"key":20,"text":549,"correct":26},"组织措施、技术措施、合同措施、经济措施、信息管理措施等",{"key":24,"text":551,"correct":22},"提高管理、施工及操作人员自身素质",{"key":28,"text":553,"correct":22},"建立完善的质量保证体系",{"key":31,"text":555,"correct":22},"加强原材料质量控制",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":28,"analysis":33},1169077,"进行施工成本控制，工程实际完成量、成本实际支出等信息的获得，主要是通过（）",[560,562,564,566],{"key":20,"text":561,"correct":22},"工程承包合同",{"key":24,"text":563,"correct":22},"施工成本计划",{"key":28,"text":565,"correct":26},"进度报告",{"key":31,"text":567,"correct":22},"施工组织设计",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":31,"analysis":33},1169078,"以下关于施工项目经理部综合性的描述，错误的是（）。",[572,574,576,578],{"key":20,"text":573,"correct":22},"施工项目经理部是企业所属的经济组织，主要职责是管理施工项目的各种经济活动",{"key":24,"text":575,"correct":22},"施工项目经理部的管理职能是综合的，包括计划、组织、控制、协调、指挥等多方面",{"key":28,"text":577,"correct":22},"施工项目经理部的管理业务是综合的，从横向看包括人、财、物、生产和经营活动，从纵向看包括施工项目寿命周期的主要过程",{"key":31,"text":579,"correct":26},"施工项目经理部受企业多个职能部门的领导",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":24,"analysis":33},1169079,"施工项目控制的任务是进行以项目进度控制、质量控制、成本控制和安全控制为主要内容的四大目标控制。其中下列不属于与施工项目成果相关的是（）。",[584,586,588,590],{"key":20,"text":585,"correct":22},"进度控制",{"key":24,"text":587,"correct":26},"安全控制",{"key":28,"text":589,"correct":22},"质量控制",{"key":31,"text":591,"correct":22},"成本控制",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":31,"analysis":33},1169080,"不属于工程主要材料的是（）",[596,598,600,602],{"key":20,"text":597,"correct":22},"钢材",{"key":24,"text":599,"correct":22},"水泥",{"key":28,"text":601,"correct":22},"砂石",{"key":31,"text":603,"correct":26},"促凝剂",[605,608,611,614,617,620],{"id":15,"name":606,"category":7,"favorite":607},"领导干部任职前廉政法规知识测试题",92,{"id":609,"name":610,"category":7,"favorite":15},595,"建筑结构与设备",{"id":612,"name":613,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":615,"name":616,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":618,"name":619,"category":7,"favorite":8},534,"BIM工程师",{"id":621,"name":619,"category":7,"favorite":8},535]