[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-833-20":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},833,"(资料员)基础知识","建筑工程",0,20,50,1192,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":25,"analysis":27},1169889,3,"判断题","基坑（槽）开挖施工工艺流程：测量放线→切线分层开挖→排水、降水→修坡→留足预留土层→整平。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",false,{"key":24,"text":25,"correct":26},"B","错误",true,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":25,"analysis":27},1169890,"防水混凝土是采用了较大的水灰比。",[32,33],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":21,"analysis":27},1169891,"卷材防水应采用沥青防水卷材或高聚物改性沥青防水卷材。",[38,39],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":21,"analysis":27},1169892,"砌筑盘角时主要大角不宜超过5皮砖，且应随砌随盘。",[44,45],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":21,"analysis":27},1169893,"常用的石砌体有料石砌体、毛石砌体、毛石混凝土砌体。",[50,51],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":25,"analysis":27},1169894,"柱钢筋绑扎的施工工艺流程为：调整插筋位置，套入箍筋→立柱子四个角的主筋→立柱内其余主筋→绑扎钢筋接头→将主骨架钢筋绑扎成形。",[56,57],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":25,"analysis":27},1169895,"对焊接缝在钢板的宽度或厚度（厚度相差大于4mm）有变化的连接中，为了减小应力集中，应从板的一侧或两侧做成坡度不小于1:2.5的斜坡，形成平缓过渡。",[62,63],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":25,"analysis":27},1169896,"钢筋混凝土扩展基础施工工艺流程：测量放线→基坑开挖、验槽→混凝土垫层施工→支基础模板→钢筋绑扎→浇基础混凝土。",[68,69],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":21,"analysis":27},1169897,"钢结构连接中铆钉连接除在一些重型和直接承受动力荷载的结构中有时有运用外，现已较少使用。（）",[74,75],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":25,"analysis":27},1169898,"皮数杆一般立于房屋的四大角、内外墙交接处、楼梯间以及洞口多的洞口。一般可每隔5～10m立一根。",[80,81],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":21,"analysis":27},1169899,"土方回填应分层进行，基础、墙体等土方应对称回填，防止两侧压力不均衡导致位移或倾覆。（）",[86,87],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":25,"analysis":27},1169900,"钢板桩支护具有施工速度快，不可重复使用的特点。",[92,93],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":21,"analysis":27},1169901,"防水层每层应连续施工，素灰层与砂浆层允许不在同一天施工完毕。",[98,99],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":25,"analysis":27},1169902,"当受拉钢筋的直径d>22mm及受压钢筋的直径d>25mm时，不宜采用绑扎搭接接头。",[104,105],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":21,"analysis":27},1169903,"垫层混凝土在验槽后应立即浇灌，以保护地基。",[110,111],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":21,"analysis":27},1169904,"自然养护是指利用平均气温高于5℃的自然条件，用保水材料或草帘等对混凝土加以覆盖后适当浇水，使混凝土在一定的时间内在湿润状态下硬化。",[116,117],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":21,"analysis":27},1169905,"土方回填压实的施工工艺流程：填方土料处理→基底处理→分层回填压实→对每层回填土的质量进行检验，符合设计要求后，填筑上一层。",[122,123],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":25,"analysis":27},1169906,"普通土的现场鉴别方法为：用镐挖掘。",[128,129],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":21,"analysis":27},1169907,"坚石和特坚石的现场鉴别方法都可以是用爆破方法。",[134,135],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":25,"analysis":27},1169908,"混凝土自然养护包括洒水养护、喷涂薄膜养生液养护以及蒸汽养护。（）",[140,141],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":25,"analysis":27},1169909,"岩土的工程分类的第五类是次坚石。",[146,147],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":21,"analysis":27},1169910,"地下工程防水方案主要有三类，分别为防水混凝土结构防水、结构表面另加防水层和防水加排水措施。（）",[152,153],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":21,"analysis":27},1169911,"钢筋作不大于900的弯折时，弯折处的弯弧内直径不应小于钢筋直径的5倍。",[158,159],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":21,"analysis":27},1169912,"钢构件拼装前应检查清除飞边、毛刺、焊接飞溅物等，摩擦面应保持干燥、整洁，不得在雨中作业。",[164,165],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":21,"analysis":27},1169913,"铆钉连接按照铆接应用情况，可以分为活动铆接、固定铆接、密缝铆接。",[170,171],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":21,"analysis":27},1169914,"混凝土必须养护至其强度达到1.2MPa以上，才准在上面行人和架设支架、安装模板。",[176,177],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":25,"analysis":27},1169915,"根据砌筑主体的不同，砌体工程可分为砖砌体工程、砌块砌体工程、配筋砌体工程。",[182,183],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":21,"analysis":27},1169916,"基坑开挖时，应对平面控制桩、水准点、基坑平面位置、水平标高、边坡坡度等经常复测检查。",[188,189],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":25,"analysis":27},1169917,"板、次梁与主梁交叉处，当有圈梁或垫梁时，主梁的钢筋在下。",[194,195],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":25,"analysis":27},1169918,"常用的钢板桩施工机械有自由落锤﹑气动锤﹑柴油锤﹑振动锤，使用最多的是柴油锤。",[200,201],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":21,"analysis":27},1169919,"生混凝土在浇筑前不应发生初凝和离析现象，混凝土运至施工现场后，其坍落度应满足设计要求。（）",[206,207],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":25,"analysis":27},1169920,"防水混凝土的配料必须按重量比准确称量，水泥用量不得少于280kg\u002Fm3。",[212,213],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":25,"analysis":27},1169921,"某施工项目为8000㎡的公共建筑工程施工，按照要求，须实行施工项目管理。",[218,219],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":21,"analysis":27},1169922,"施工项目是指建筑企业自施工投标开始到保修期满为止的全部过程中完成的项目。",[224,225],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":25,"analysis":27},1169923,"施工现场包括红线以内占用的建筑用地和施工用地以及临时施工用地。",[230,231],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":25,"analysis":27},1169924,"成本控制的第一步是预测。（）",[236,237],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":25,"analysis":27},1169925,"保修期为自竣工验收之日计算，在正常使用条件下的最低保修期限。",[242,243],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":25,"analysis":27},1169926,"机械设备管理的关键在于使用，使用的关键在于提高利用率和完好率。利用率的提高在于维修和保养，完好率的提高靠人。（）",[248,249],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":25,"analysis":27},1169927,"建立工程进度报告制度及信息沟通网络属于进度控制措施的管理措施。（）",[254,255],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":25,"analysis":27},1169928,"质量是一组固有特性满足要求的程度，即产品的质量。",[260,261],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":25,"analysis":27},1169929,"施工项目成本核算的对象按单位工程划分，以一个季度为一个核算期，采用会计核算、统计核算、业务核算“三算结合”的方法。",[266,267],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":21,"analysis":27},1169930,"在现代施工企业的项目管理中，施工项目经理是施工项目的最高责任人和组织者，是决定施工项目盈亏的关键性角色。",[272,273],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":25,"analysis":27},1169931,"分部工程也称为施工项目。（）",[278,279],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":25,"analysis":27},1169932,"施工项目的生产要素主要包括劳动力、材料、技术和资金。",[284,285],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":21,"analysis":27},1169933,"项目是指为达到符合规定要求的目标，按限定时间、限定资源和限定质量标准等约束条件完成的，由一系列相互协调的受控活动组成的特定过程。",[290,291],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":25,"analysis":27},1169934,"工程项目经理部可以同时采用矩阵式与工作队式的组织结构形式。（）",[296,297],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":25,"analysis":27},1169935,"项目质量控制贯穿于项目施工的全过程。",[302,303],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":21,"analysis":27},1169936,"施工生产要素的管理对施工项目的质量、进度、成本和安全都有重要影响。（）",[308,309],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":25,"analysis":27},1169937,"施工现场平面布置图是一成不变的，在工程开工前可以一次性设计好。（）",[314,315],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":21,"analysis":27},1169938,"安全检查可分为日常性检查、专业性检查、季节性检查、节假日前后的检查和不定期检查。（）",[320,321],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]