[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1169959":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1169959,833,3,"判断题","投标人应按招标人提供的工程量清单填报价格，填写的项目编码、项目名称、项目特征、计量单位、工程量必须与招标人提供的一致。（）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"投标人应按招标人提供的工程量清单填报价格，填写的项目编码、项目名称、项目特征、计量单位、工程量必须与招标人提供的一致。",{"id":6,"name":21,"category":22,"favorite":23},"(资料员)基础知识","建筑工程",0]