[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1169701":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1169701,833,2,"多选题","分部分项工程量清单包括项目编码、（）",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","项目名称",true,{"key":16,"text":17,"correct":14},"B","计量单位",{"key":19,"text":20,"correct":14},"C","工程量",{"key":22,"text":23,"correct":24},"D","综合单价",false,{"key":26,"text":27,"correct":14},"E","项目特征","ABCE","分部分项工程量清单应包括项目编码、项目名称、项目特征、计量单位和工程量。",{"id":6,"name":31,"category":32,"favorite":33},"(资料员)基础知识","建筑工程",0]