[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1169675":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},1169675,833,2,"多选题","一个建设工程项目的工程量清单有五个部分组成，分别是（）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","分部分项工程量清单",true,{"key":16,"text":17,"correct":14},"B","措施项目清单",{"key":19,"text":20,"correct":14},"C","其他项目清单",{"key":22,"text":23,"correct":14},"D","规费项目清单",{"key":25,"text":26,"correct":14},"E","税金项目清单","ABCDE","一个建设工程项目的工程量清单有五个部分组成，分别是分部分项工程量清单、措施项目清单、其他项目清单、规费项目清单、税金项目清单。",{"id":6,"name":30,"category":31,"favorite":32},"(资料员)基础知识","建筑工程",0]