[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1169655":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},1169655,833,2,"多选题","施工阶段的主要工作由项目经理部实施。其主要工作包括：()。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","做好动态控制工作，保证质量、进度、成本、安全目标的全面实现",true,{"key":16,"text":17,"correct":14},"B","管理施工现场，实现文明施工",{"key":19,"text":20,"correct":14},"C","严格履行合同，协调好与建设单位、监理单位、设计单位等相关单位的关系",{"key":22,"text":23,"correct":14},"D","处理好合同变更及索赔",{"key":25,"text":26,"correct":14},"E","做好记录、检查、分析和改进工作","ABCDE","施工阶段的目标是完成合同规定的全部施工任务，达到交工验收条件。该阶段的主要工作由项目经理部实施。其主要工作包括：①做好动态控制工作，保证质量、进度、成本、安全目标的合理全面；②管理施工现场，实现文明施工；③严格履行合同，协调好与建设单位、监理单位、设计单位等相关单位的关系；④处理好合同变更及索赔；⑤做好记录、检查、分析和改进工作。",{"id":6,"name":30,"category":31,"favorite":32},"(资料员)基础知识","建筑工程",0]