[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1169650":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1169650,833,2,"多选题","对于工程质量问题，可采用的处理方案有（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","修补处理",true,{"key":16,"text":17,"correct":18},"B","停工处理",false,{"key":20,"text":21,"correct":14},"C","加固处理",{"key":23,"text":24,"correct":14},"D","返工处理",{"key":26,"text":27,"correct":14},"E","不做处理","ACDE","对于工程质量问题，可采用的处理方案有：1、经原设计单位或有资质的设计单位复核满足要求不做处理；2、报监理审批后修补处理；3、有资质的加固单位加固处理；4.返工处理。",{"id":6,"name":31,"category":32,"favorite":33},"(资料员)基础知识","建筑工程",0]