[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1169296":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1169296,833,1,"单选题","根据《建筑工程工程量清单计价规范》（）B50500一2013），工程量清单的组成不包括（）",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","分部分项工程量清单",false,{"key":16,"text":17,"correct":14},"B","其他项目清单",{"key":19,"text":20,"correct":14},"C","措施项目清单",{"key":22,"text":23,"correct":24},"D","计价、评标详细内容清单",true,"招标工程量清单应以单位（项）工程为单位编制，应由分部分项工程量清单、措施项目清单、其他项目清单、规费和税金项目清单组成。",{"id":6,"name":27,"category":28,"favorite":29},"(资料员)基础知识","建筑工程",0]