[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1169295":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1169295,833,1,"单选题","施工预算的编制单位是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","建设单位",false,{"key":16,"text":17,"correct":18},"B","施工单位",true,{"key":20,"text":21,"correct":14},"C","设计单位",{"key":23,"text":24,"correct":14},"D","监理单位","施工预算是指在施工阶段，在施工图预算的控制下，施工单位项目部根据施工图计算的分部分项工程量、施工定额、单位工程施工组织计划、工程项目预定的目标利润等资料，通过工料分析，计算完成一个单位工程中的分部分项工程所需的人工、材料、机械台班消耗量及相应费用的经济文件，是用来确定施工成本计划目标值的依据。",{"id":6,"name":27,"category":28,"favorite":29},"(资料员)基础知识","建筑工程",0]