[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1169294":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1169294,833,1,"单选题","除合同另有约定外，下列关于进度款支付申请包括内容不正确的是（）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","累计已完成的工程价款",false,{"key":16,"text":17,"correct":18},"B","累计未支付的工程价款",true,{"key":20,"text":21,"correct":14},"C","应增加和扣减的变更金额",{"key":23,"text":24,"correct":14},"D","应增加和扌日减的索赔金额","除合同另有约定外，不得累计未支付的工程价款",{"id":6,"name":27,"category":28,"favorite":29},"(资料员)基础知识","建筑工程",0]