[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1169284":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1169284,833,1,"单选题","采暖系统安装完毕，管道保温之前应按设计和规范要求进行系统（）试验。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","风压",false,{"key":16,"text":17,"correct":14},"B","气压",{"key":19,"text":20,"correct":21},"C","水压",true,{"key":23,"text":24,"correct":14},"D","温度","采暖系统安装完毕，管道保温之前应按设计和规范要求进行系统水压试验。",{"id":6,"name":27,"category":28,"favorite":29},"(资料员)基础知识","建筑工程",0]