[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1169266":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1169266,833,1,"单选题","关于招标控制价，以下说法错误的是（）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","招标控制价应该在开标时公布",true,{"key":16,"text":17,"correct":18},"B","招标控制价不应上调或下浮",false,{"key":20,"text":21,"correct":18},"C","招标人应将招标控制价及有关资料报送工程所在地工程造价管理机构备查",{"key":23,"text":24,"correct":18},"D","投标人经复核认为招标人公布的招标控制价未按规范进行编制的，应向招投标监督机构或工程造价管理机构投诉","招标人应在发布招标文件时公布招标控制价。",{"id":6,"name":27,"category":28,"favorite":29},"(资料员)基础知识","建筑工程",0]