[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1169144":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1169144,833,1,"单选题","措施项目清单中的（）应按国家或省级行业建设主管部门的规定计价，不得作为竞争性费用。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","安全文明施工费",true,{"key":16,"text":17,"correct":18},"B","夜间施工费",false,{"key":20,"text":21,"correct":18},"C","施工降排水费",{"key":23,"text":24,"correct":18},"D","冬雨期施工费","冬雨期施工増加费：是指在冬期或雨期施工需增加的临时设施、防滑、排除雨雪，人工及施工机械效率降低等费用。",{"id":6,"name":27,"category":28,"favorite":29},"(资料员)基础知识","建筑工程",0]