[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1169133":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1169133,833,1,"单选题","实行工程量清单计价的工程，宜采用（）合同。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","总价",false,{"key":16,"text":17,"correct":18},"B","单价合同",true,{"key":20,"text":21,"correct":14},"C","可调价",{"key":23,"text":24,"correct":14},"D","成本加酬金","实行工程量清单计价的工程，宜采用单价合同。",{"id":6,"name":27,"category":28,"favorite":29},"(资料员)基础知识","建筑工程",0]