[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1169123":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1169123,833,1,"单选题","施工质量保证体系运行的PDCA循环原理是（）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","计划、检查、实施、处理",false,{"key":16,"text":17,"correct":18},"B","计划、实施、检查、处理",true,{"key":20,"text":21,"correct":14},"C","检查、计划、实施、处理",{"key":23,"text":24,"correct":14},"D","检查、计划、处理、实施","施工质量保证体系运行的PDCA循环原理计划、实施、检查、处理",{"id":6,"name":27,"category":28,"favorite":29},"(资料员)基础知识","建筑工程",0]