[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1169110":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1169110,833,1,"单选题","对（）的控制，尤其是施工方案的正确选择，是直接影响施工项目的进度控制、质量控制和投资控制三大目标能否顺利实现的关键。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","人",false,{"key":16,"text":17,"correct":14},"B","材料",{"key":19,"text":20,"correct":14},"C","机械设备",{"key":22,"text":23,"correct":24},"D","工艺方法",true,"施工工艺是否先进合理是直接影响工程质量、工程进度及工程造价的关键因素，施工工艺是否合理可靠也直接影响到工程施工安全；施工方案的正确与否，是直接影响工程项目的进度控制、质量控制、投资控制三大目标能否顺利实现的重要环节。",{"id":6,"name":27,"category":28,"favorite":29},"(资料员)基础知识","建筑工程",0]