[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1169045":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1169045,833,1,"单选题","下列关于毛石砌体施工工艺的基本规定中，有误的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","毛石料和粗石料砌体的灰缝厚度不宜大于10mm，细石料砌体的灰缝厚度不宜小于10mm",true,{"key":16,"text":17,"correct":18},"B","施工工艺流程为：施工准备→试排撂底→砌筑毛石（同时搅拌砂浆）→勾缝→检验评定",false,{"key":20,"text":21,"correct":18},"C","每日砌筑高度不宜超过1.2m，在转角处及交接处应同时砌筑，如不能同时砌筑时，应留斜槎",{"key":23,"text":24,"correct":18},"D","毛石挡土墙一般按3～4皮为一个分层高度砌筑，每砌一个分层高度应找平一次","毛石料和粗石料砌体的灰缝厚度不宜大于20mm，细石料砌体的灰缝厚度不宜小于5mm。施工工艺流程为：施工准备→试排撂底→砌筑毛石（同时搅拌砂浆）→勾缝→检验评定。每日砌筑高度不宜超过1.2m，在转角处及交接处应同时砌筑，如不能同时砌筑时，应留斜槎。毛石挡土墙一般按3～4皮为一个分层高度砌筑，每砌一个分层高度应找平一次。",{"id":6,"name":27,"category":28,"favorite":29},"(资料员)基础知识","建筑工程",0]