[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1168751":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1168751,832,2,"多选题","施工企业的期间费用主要包括( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","管理费用",true,{"key":16,"text":17,"correct":18},"B","直接费用",false,{"key":20,"text":21,"correct":14},"C","财务费用",{"key":23,"text":24,"correct":18},"D","间接费用",{"key":26,"text":27,"correct":18},"E","生产费用","AC","",{"id":6,"name":31,"category":32,"favorite":33},"通用基础","建筑工程",0]