[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1168535":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1168535,832,1,"单选题","施工项目成本控制的措施是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","组织措施、技术措施、经济措施",true,{"key":16,"text":17,"correct":18},"B","控制人工费用、控制材料费、控制机械费用、控制间接费及其他直接费",false,{"key":20,"text":21,"correct":18},"C","组织措施、制度措施、管理措施",{"key":23,"text":24,"correct":18},"D","管理措施、技术措施、人力措施","",{"id":6,"name":27,"category":28,"favorite":29},"通用基础","建筑工程",0]