[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1168511":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1168511,832,1,"单选题","以下不属于施工项目现场管理内容的是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","建立施工现场管理组织",false,{"key":16,"text":17,"correct":14},"B","建立文明施工现场",{"key":19,"text":20,"correct":14},"C","及时清场转移",{"key":22,"text":23,"correct":24},"D","根据施工工程任务需要及时调整项目经理部",true,"",{"id":6,"name":27,"category":28,"favorite":29},"通用基础","建筑工程",0]