[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-830-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":603},{"id":5,"name":6,"category":7,"favorite":8},830,"(劳务员)专业管理实务 岗位知识","建筑工程",0,2,50,1021,[13,34,46,58,70,82,94,106,118,130,141,153,165,177,189,201,213,225,237,246,258,270,281,292,301,313,322,334,345,357,369,378,390,402,414,423,435,447,459,471,483,495,507,519,531,543,555,567,579,591],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1167481,1,"单选题","下列（ ）培训属于劳务培训计划的分类。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","素质",false,{"key":24,"text":25,"correct":22},"B","理论",{"key":27,"text":28,"correct":22},"C","职业道德",{"key":30,"text":31,"correct":32},"D","专项",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1167482,"关于劳动力的需求计划表的表格的形式，说法正确的是：（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":32},"国家及行业无统一限制，各企业可根据自身需要来制定",{"key":24,"text":41,"correct":22},"按国家统一格式",{"key":27,"text":43,"correct":22},"按行业统一格式",{"key":30,"text":45,"correct":22},"既可按国家统一格式也可按行业统一格式",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1167483,"编制劳动力总需求计划时，在资料比较少，一般在仅具有施工方案和生产规模的资料的情况下，使用下列哪一种方法。（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"概算定额法",{"key":24,"text":53,"correct":32},"经验比较法",{"key":27,"text":55,"correct":22},"分项综合系数法",{"key":30,"text":57,"correct":22},"公式法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1167484,"关于培训需求分析的作用，下列说法错误的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"充分认识现状与目的差距",{"key":24,"text":65,"correct":32},"促进劳务管理工作和劳务培训工作的分离",{"key":27,"text":67,"correct":22},"提供解决实际问题的方法",{"key":30,"text":69,"correct":22},"能够得出大量员工培训的相关成果",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":30,"analysis":33},1167485,"关于劳动力需求计划的编制原则，下列说法错误的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"劳务需求计划应以劳动定额为依据",{"key":24,"text":77,"correct":22},"符合项目实施过程中进度计划变化的要求",{"key":27,"text":79,"correct":22},"控制人工成本，实现企业劳动力资源市场化的优化配置",{"key":30,"text":81,"correct":32},"优先选用外部劳动力",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1167486,"某工程队有建安工人300人，月计划完成施工产值3750000元，百元产值工资系数为14％，计划平均工资（ ）元。",[86,88,90,92],{"key":20,"text":87,"correct":32},"1750",{"key":24,"text":89,"correct":22},"800",{"key":27,"text":91,"correct":22},"12500",{"key":30,"text":93,"correct":22},"52500",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},1167487,"下列各项中，不属于制定培训需求调查计划的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"确定培训需求调查的内容",{"key":24,"text":101,"correct":22},"确定培训需求调查的目标和程序",{"key":27,"text":103,"correct":22},"选择合适的培训需求调查方法",{"key":30,"text":105,"correct":32},"选择合适的培训需求调查层面",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1167488,"某工程承包作业5000㎡，计划每平方米单位用工5个工日，每个工日单价40元，计划工期为306天，计划劳动生产率指数为120％。计划工资总额（ ）万元。（保留整数）",[110,112,114,116],{"key":20,"text":111,"correct":22},"50",{"key":24,"text":113,"correct":32},"100",{"key":27,"text":115,"correct":22},"200",{"key":30,"text":117,"correct":22},"1000",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1167489,"关于编制培训计划的要求，下列说法错误的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"要理论与实践相结合",{"key":24,"text":125,"correct":22},"要思想和专业相结合",{"key":27,"text":127,"correct":32},"要实践和专业相结合",{"key":30,"text":129,"correct":22},"要与组织战略、组织文化相结合",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":30,"analysis":33},1167490,"某工程承包作业5000㎡，计划每平方米单位用工5个工日，每个工日单价40元，计划工期为306天，计划劳动生产率指数为120％。计划用工为（ ）工日。（保留整数）",[134,136,137,139],{"key":20,"text":135,"correct":22},"82",{"key":24,"text":113,"correct":22},{"key":27,"text":138,"correct":22},"200000",{"key":30,"text":140,"correct":32},"20833",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":27,"analysis":33},1167491,"公司编制的劳务用工需求量计划表与项目部编制的劳务用工需求量计划表相比，增加了（ ）要求。",[145,147,149,151],{"key":20,"text":146,"correct":22},"需求人数",{"key":24,"text":148,"correct":22},"时间",{"key":27,"text":150,"correct":32},"平衡人数",{"key":30,"text":152,"correct":22},"签字要求",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":24,"analysis":33},1167492,"某项目基础底板施工，合同约定工期45天，项目经理部根据业主提供的电子版图纸编制了施工进度（如图），底板施工暂未考虑流水施工。施工进度计划图因业主未按时提供正式图纸，致使工序E在6月6日才开始。基于安全考虑，建设单位要求仍按原合同约定的时间完成底板施工，为此施工单位采取调整劳动力计划，增加劳动力等措施，在15天内完成了2700t钢筋制作（工效为4.5t\u002F人．工作日）。 钢筋制作的劳动力投入量为（ ）工日。",[157,159,161,163],{"key":20,"text":158,"correct":22},"15",{"key":24,"text":160,"correct":32},"40",{"key":27,"text":162,"correct":22},"90",{"key":30,"text":164,"correct":22},"180",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":24,"analysis":33},1167493,"某项目基础底板施工，合同约定工期45天，项目经理部根据业主提供的电子版图纸编制了施工进度（如图），底板施工暂未考虑流水施工。施工进度计划图因业主未按时提供正式图纸，致使工序E在6月6日才开始。基于安全考虑，建设单位要求仍按原合同约定的时间完成底板施工，为此施工单位采取调整劳动力计划，增加劳动力等措施，在15天内完成了2700t钢筋制作（工效为4.5t\u002F人．工作日）。 劳动力总需求计划的编制程序中，第一步是：（ ）。",[169,171,173,175],{"key":20,"text":170,"correct":22},"确定劳动力投人量",{"key":24,"text":172,"correct":32},"确定劳动效率",{"key":27,"text":174,"correct":22},"计算流水步距",{"key":30,"text":176,"correct":22},"计算流水节拍",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":27,"analysis":33},1167494,"当绘制企业各项目劳动力负荷曲线数据不足时，可以采用（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":22},"标准（典型）横道法",{"key":24,"text":184,"correct":22},"标准（典型）直方图法",{"key":27,"text":186,"correct":32},"标准（典型）曲线法",{"key":30,"text":188,"correct":22},"劳动力动员直方图法",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":30,"analysis":33},1167495,"劳动用工相关计算指标不包括（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":22},"计划平均人数",{"key":24,"text":196,"correct":22},"计划工资总额",{"key":27,"text":198,"correct":22},"劳动定额完成情况",{"key":30,"text":200,"correct":32},"计划用工缺口",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":27,"analysis":33},1167496,"在劳动定额中，劳动效率代表了（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":22},"社会一般水平",{"key":24,"text":208,"correct":22},"社会先进水平",{"key":27,"text":210,"correct":32},"社会平均先进水平",{"key":30,"text":212,"correct":22},"社会最高水平",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":27,"analysis":33},1167497,"劳务分包合同及人员备案的主管单位是（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":22},"总承包企业",{"key":24,"text":220,"correct":22},"业主方",{"key":27,"text":222,"correct":32},"政府建设主管部门",{"key":30,"text":224,"correct":22},"工程项目经理部",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":27,"analysis":33},1167498,"下列（ ）不属于劳务培训计划的编制原则。",[229,231,233,235],{"key":20,"text":230,"correct":22},"理论与实践相结合的原则",{"key":24,"text":232,"correct":22},"培训与提高相结合的原则",{"key":27,"text":234,"correct":32},"职业道德培训与专业素质相结合原则",{"key":30,"text":236,"correct":22},"人员培训与企业文化相适应原则",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":27,"analysis":33},1167499,"某工程队有建安工人300人，月计划完成施工产值3750000元，百元产值工资系数为14％，计划工资总额为（ ）。",[241,242,243,244],{"key":20,"text":87,"correct":22},{"key":24,"text":91,"correct":22},{"key":27,"text":93,"correct":32},{"key":30,"text":245,"correct":22},"53300",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":20,"analysis":33},1167500,"劳务培训的内容要注重（ ）三者的兼顾。",[250,252,254,256],{"key":20,"text":251,"correct":32},"知识、技能、态度",{"key":24,"text":253,"correct":22},"学历、技能、态度",{"key":27,"text":255,"correct":22},"学历、经验、态度",{"key":30,"text":257,"correct":22},"知识、经验、态度",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":20,"analysis":33},1167501,"在建筑工程施工中，劳动效率通常用（ ）表示。",[262,264,266,268],{"key":20,"text":263,"correct":32},"产量\u002F单位时间",{"key":24,"text":265,"correct":22},"产量\u002F单位工作量",{"key":27,"text":267,"correct":22},"工时消耗量\u002F单位时间",{"key":30,"text":269,"correct":22},"工时消耗量\u002F产量",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":27,"analysis":33},1167502,"劳动力总量需求计划的编制程序不包括（ ）。",[274,275,277,279],{"key":20,"text":172,"correct":22},{"key":24,"text":276,"correct":22},"确定劳动力投入量",{"key":27,"text":278,"correct":32},"确定劳动总产量",{"key":30,"text":280,"correct":22},"编制劳动力需求计划",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":24,"analysis":33},1167503,"某工程承包作业5000平方米，计划每平方米单位用工5个工日，每个工日单价40元，计划工期为306天，计划劳动生产率指数120%。则计划平均人数为（ ）人。",[285,287,288,290],{"key":20,"text":286,"correct":22},"72",{"key":24,"text":135,"correct":32},{"key":27,"text":289,"correct":22},"91",{"key":30,"text":291,"correct":22},"85",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":30,"analysis":33},1167504,"某项目基础底板施工，合同约定工期45天，项目经理部根据业主提供的电子版图纸编制了施工进度（如图），底板施工暂未考虑流水施工。施工进度计划图因业主未按时提供正式图纸，致使工序E在6月6日才开始。基于安全考虑，建设单位要求仍按原合同约定的时间完成底板施工，为此施工单位采取调整劳动力计划，增加劳动力等措施，在15天内完成了2700t钢筋制作（工效为4.5t\u002F人．工作日）。 劳动力总需求计划的编制方法不包括（ ）。",[296,297,298,299],{"key":20,"text":53,"correct":22},{"key":24,"text":55,"correct":22},{"key":27,"text":51,"correct":22},{"key":30,"text":300,"correct":32},"技术测定法",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":20,"analysis":33},1167505,"对政府的产业政策的分析属于（ ）层次分析。",[305,307,309,311],{"key":20,"text":306,"correct":32},"企业",{"key":24,"text":308,"correct":22},"工程项目",{"key":27,"text":310,"correct":22},"工作岗位",{"key":30,"text":312,"correct":22},"员工个人",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":24,"analysis":33},1167506,"下列不属于培训需求的类别的是（ ）层次分析。",[317,318,320,321],{"key":20,"text":308,"correct":22},{"key":24,"text":319,"correct":32},"工程类别",{"key":27,"text":310,"correct":22},{"key":30,"text":312,"correct":22},{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},1167507,"下列属于培训后评估的主要内容的是（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":32},"反应评估即在课程刚结束的时候，了解学员对培训项目的主观感觉和满意程度",{"key":24,"text":329,"correct":22},"学习评估主要是评价参加者通过培训学习态度的变化",{"key":27,"text":331,"correct":22},"行为评估主要是评估学员在工作中的思维方式有多大程度的改变",{"key":30,"text":333,"correct":22},"结果评估着眼于由培训项目引起的工作过程的变化情况",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":30,"analysis":33},1167508,"（ ）依照劳动合同约定标准，以实际出勤情况为依据，编制工资表。",[338,340,342,343],{"key":20,"text":339,"correct":22},"作业队队长",{"key":24,"text":341,"correct":22},"总承包劳务管理部门",{"key":27,"text":224,"correct":22},{"key":30,"text":344,"correct":32},"作业队伍中的劳务员",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":30,"analysis":33},1167509,"不属于施工劳动力主要类型的是（ ）。",[349,351,353,355],{"key":20,"text":350,"correct":22},"企业自有工人",{"key":24,"text":352,"correct":22},"聘用外来劳务企业工人",{"key":27,"text":354,"correct":22},"使用劳务派遣工人",{"key":30,"text":356,"correct":32},"临时零星用工",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":24,"analysis":33},1167510,"下列各项中，不属于施工劳动力结构特点的是（ ）。",[361,363,365,367],{"key":20,"text":362,"correct":22},"劳动力主要集中在劳务分包企业",{"key":24,"text":364,"correct":32},"劳动力主要来源于城镇",{"key":27,"text":366,"correct":22},"劳动力的聘用期相对较短",{"key":30,"text":368,"correct":22},"普通工人多于高技能工人",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":27,"analysis":33},1167511,"每月由（ ）填报《劳务费结算支付情况月报表》。",[373,375,376,377],{"key":20,"text":374,"correct":22},"总承包企业主管领导",{"key":24,"text":341,"correct":22},{"key":27,"text":224,"correct":32},{"key":30,"text":344,"correct":22},{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":27,"analysis":33},1167512,"下列各项中，不属于培训需求调查方法的是（ ）。",[382,384,386,388],{"key":20,"text":383,"correct":22},"面谈法",{"key":24,"text":385,"correct":22},"观察法",{"key":27,"text":387,"correct":32},"专家意见法",{"key":30,"text":389,"correct":22},"问卷调查法",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":27,"analysis":33},1167513,"在施工准备阶段，（ ）首先根据投标文件中的施工组织设计编制劳务用工需求量计划。",[394,396,398,400],{"key":20,"text":395,"correct":22},"总承包单位公司",{"key":24,"text":397,"correct":22},"施工劳务企业",{"key":27,"text":399,"correct":32},"项目部",{"key":30,"text":401,"correct":22},"劳务队伍",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":24,"analysis":33},1167514,"某队有生产工人100人，7月份病事假72工日，开会学习40工日，公休假日8天，加班450工日，出差、联系材料20工日，其中1人协助炊事班，2人守卫，其与工人没有执行定额的620工日，全月共完成定额工日2025工日。则7月份执行定额面为（ ）。",[406,408,410,412],{"key":20,"text":407,"correct":22},"65.46%",{"key":24,"text":409,"correct":32},"75.68%",{"key":27,"text":411,"correct":22},"78.46%",{"key":30,"text":413,"correct":22},"79.44%",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":24,"analysis":33},1167515,"由于设计变更或其他情况，往往会产生工程量的变化。（ ）应根据劳务净需求的新增（减）部分，制定具体的补充或调剂计划。",[418,420,421,422],{"key":20,"text":419,"correct":22},"公司劳务主管部门",{"key":24,"text":399,"correct":32},{"key":27,"text":397,"correct":22},{"key":30,"text":401,"correct":22},{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":24,"analysis":33},1167516,"关于劳动力需求计划的编制要求，下列说法错误的是（ ）。",[427,429,431,433],{"key":20,"text":428,"correct":22},"要保持劳动力均衡使用",{"key":24,"text":430,"correct":32},"要保证劳动力有一定的富余量",{"key":27,"text":432,"correct":22},"以施工组织设计和进度计划编制依据",{"key":30,"text":434,"correct":22},"要准确计算工程量",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":30,"analysis":33},1167517,"下列各项中，不属于劳动合同自行解除情形的是（ ）。",[439,441,443,445],{"key":20,"text":440,"correct":22},"被开除",{"key":24,"text":442,"correct":22},"被劳动教养",{"key":27,"text":444,"correct":22},"被判刑",{"key":30,"text":446,"correct":32},"留职停薪",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":20,"analysis":33},1167518,"根据我国《合同法》的有关规定，采用格式条款订立合同的，提供格式条款的一方应遵循（ ）原则确定当事人之间的权利和义务，并采取合理的方式提请对方注意免除或者限制其责任的条款，按照对方的要求，对该条款予以说明。",[451,453,455,457],{"key":20,"text":452,"correct":32},"公平",{"key":24,"text":454,"correct":22},"公正",{"key":27,"text":456,"correct":22},"公开",{"key":30,"text":458,"correct":22},"合法",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":20,"analysis":33},1167519,"（ ）是劳动者与用人单位之间建立劳动关系的法律依据，是双方当事人明确各自权利与义务的基本形式，也是劳动者维护自身合法权益的最直接的证据。",[463,465,467,469],{"key":20,"text":464,"correct":32},"劳动合同",{"key":24,"text":466,"correct":22},"劳务合同",{"key":27,"text":468,"correct":22},"口头协议",{"key":30,"text":470,"correct":22},"书面协议",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":24,"analysis":33},1167520,"非全日制用工劳动报酬结算周期不得超过（ ）。",[475,477,479,481],{"key":20,"text":476,"correct":22},"24日",{"key":24,"text":478,"correct":32},"15日",{"key":27,"text":480,"correct":22},"7天",{"key":30,"text":482,"correct":22},"一个月",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":24,"analysis":33},1167521,"下列关于劳动者与用人单位的竞业限制说法错误的是（ ）。",[487,489,491,493],{"key":20,"text":488,"correct":22},"竞业限制期间应给予劳动者经济补偿",{"key":24,"text":490,"correct":32},"竞业限制的人员适用于用人单位的所有人",{"key":27,"text":492,"correct":22},"竞业限制期限不得超过两年",{"key":30,"text":494,"correct":22},"竞业期内可以到非竞业单位就业",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":20,"analysis":33},1167522,"根据《劳动合同法》的规定，劳动者不能胜任工作，经过培训或者调整工作岗位，仍不能胜任工作的，用人单位可以提前（ ）日以书面形式通知劳动者本人或者额外支付劳动者（ ）个月工资后，解除劳动合同。",[499,501,503,505],{"key":20,"text":500,"correct":32},"30一",{"key":24,"text":502,"correct":22},"30二",{"key":27,"text":504,"correct":22},"60一",{"key":30,"text":506,"correct":22},"60二",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":27,"analysis":33},1167523,"在审查劳动合同的主体中对劳动者资格合法的条件是：劳动者应当是年满（ ）周岁，具备民事行为能力，身体条件和工作能力符合用人单位招聘条件。",[511,513,515,517],{"key":20,"text":512,"correct":22},"16",{"key":24,"text":514,"correct":22},"17",{"key":27,"text":516,"correct":32},"18",{"key":30,"text":518,"correct":22},"20",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":27,"analysis":33},1167524,"在劳动合同必备条款中，工作内容是指（ ）所指向的对象，即劳动者具体从事什么种类或者内容的劳动，这里的工作内容是指工作岗位和工作任务或职责。",[523,525,527,529],{"key":20,"text":524,"correct":22},"劳动关系",{"key":24,"text":526,"correct":22},"合同关系",{"key":27,"text":528,"correct":32},"劳动法律关系",{"key":30,"text":530,"correct":22},"用人关系",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":24,"analysis":33},1167525,"双方当事人可以订立口头劳动合同的用工方式是（ ）。",[535,537,539,541],{"key":20,"text":536,"correct":22},"全日制用工",{"key":24,"text":538,"correct":32},"非全日制用工",{"key":27,"text":540,"correct":22},"劳务派遣用工",{"key":30,"text":542,"correct":22},"建筑劳务分包用工",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":30,"analysis":33},1167526,"劳动合同法第三十条第二款规定了用人单位拖欠或者未足额发放劳动报酬的，劳动者可以依法向当地人民法院申请（ ）。",[547,549,551,553],{"key":20,"text":548,"correct":22},"法律援助",{"key":24,"text":550,"correct":22},"诉讼",{"key":27,"text":552,"correct":22},"调解",{"key":30,"text":554,"correct":32},"支付令",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":24,"analysis":33},1167527,"下列不属于变更劳动合同的程序是（ ）。",[559,561,563,565],{"key":20,"text":560,"correct":22},"提出要求",{"key":24,"text":562,"correct":32},"协商研究",{"key":27,"text":564,"correct":22},"做出答复",{"key":30,"text":566,"correct":22},"签订协议",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":30,"analysis":33},1167528,"劳动合同的主体是（ ）。",[571,573,575,577],{"key":20,"text":572,"correct":22},"用人单位",{"key":24,"text":574,"correct":22},"劳动者",{"key":27,"text":576,"correct":22},"参与第三方",{"key":30,"text":578,"correct":32},"用人单位和劳动者",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":24,"analysis":33},1167529,"某公司欲与乙签订一份为期3年的劳动合同，试用期不得超过（ ）。",[583,585,587,589],{"key":20,"text":584,"correct":22},"1个月",{"key":24,"text":586,"correct":32},"6个月",{"key":27,"text":588,"correct":22},"3个月",{"key":30,"text":590,"correct":22},"2个月",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":20,"analysis":33},1167530,"劳务派遣单位跨地区派遣劳动者的，被派遣劳动者享有的劳动报酬和劳动条件，按照（ ）的标准执行。",[595,597,599,601],{"key":20,"text":596,"correct":32},"用工单位所在地",{"key":24,"text":598,"correct":22},"劳务派遣单位所在地",{"key":27,"text":600,"correct":22},"被派遣劳动者户籍所在地",{"key":30,"text":602,"correct":22},"工资发放地",[604,607,610,613,616,619],{"id":15,"name":605,"category":7,"favorite":606},"领导干部任职前廉政法规知识测试题",92,{"id":608,"name":609,"category":7,"favorite":15},595,"建筑结构与设备",{"id":611,"name":612,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":614,"name":615,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":617,"name":618,"category":7,"favorite":8},534,"BIM工程师",{"id":620,"name":618,"category":7,"favorite":8},535]