[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-830-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":604},{"id":5,"name":6,"category":7,"favorite":8},830,"(劳务员)专业管理实务 岗位知识","建筑工程",0,1,50,1021,[13,33,45,57,69,81,93,105,116,126,138,150,161,173,185,197,209,219,231,243,254,262,274,283,295,307,319,331,343,355,367,379,391,403,414,426,438,450,462,474,486,498,510,522,533,544,556,568,580,592],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":26,"analysis":32},1167431,"单选题","比较类推法，也称（ ）。",[18,22,25,29],{"key":19,"text":20,"correct":21},"A","比例数示法",false,{"key":23,"text":24,"correct":21},"B","经验估计法",{"key":26,"text":27,"correct":28},"C","典型定额法",true,{"key":30,"text":31,"correct":21},"D","统计分析法","",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":19,"analysis":32},1167432,"技术测定法适用于（ ）。",[37,39,41,43],{"key":19,"text":38,"correct":28},"所有类型的施工作业",{"key":23,"text":40,"correct":21},"批量小的施工作业",{"key":26,"text":42,"correct":21},"批量大的施工作业",{"key":30,"text":44,"correct":21},"复杂程度高的施工作业",{"id":46,"libraryId":5,"type":9,"typeLabel":15,"stem":47,"options":48,"answer":23,"analysis":32},1167433,"损失时间中不包括：（ ）。",[49,51,53,55],{"key":19,"text":50,"correct":21},"有多余和偶然工作时间",{"key":23,"text":52,"correct":28},"休息时间",{"key":26,"text":54,"correct":21},"停工时间",{"key":30,"text":56,"correct":21},"违背劳动纪律所引起的工时损失时间",{"id":58,"libraryId":5,"type":9,"typeLabel":15,"stem":59,"options":60,"answer":26,"analysis":32},1167434,"关于统计分析法，以下说法错误的是（ ）。",[61,63,65,67],{"key":19,"text":62,"correct":21},"简便易行",{"key":23,"text":64,"correct":21},"需要有较多的数据资料",{"key":26,"text":66,"correct":28},"适用于批量小的施工作业",{"key":30,"text":68,"correct":21},"更能反映实际施工水平",{"id":70,"libraryId":5,"type":9,"typeLabel":15,"stem":71,"options":72,"answer":23,"analysis":32},1167435,"用经验估工法确定某一个施工过程单位合格产品工时消耗，通过座谈讨论估计出了三种不同的的工时消耗，分别为0.45、0.6、0.7，计算器定额时间为（ ）。",[73,75,77,79],{"key":19,"text":74,"correct":21},"0.51",{"key":23,"text":76,"correct":28},"0.59",{"key":26,"text":78,"correct":21},"0.63",{"key":30,"text":80,"correct":21},"0.67",{"id":82,"libraryId":5,"type":9,"typeLabel":15,"stem":83,"options":84,"answer":26,"analysis":32},1167436,"下列各项中，不属于损失时间的是（ ）。",[85,87,89,91],{"key":19,"text":86,"correct":21},"施工组织和技术上的缺点而产生的时间消耗",{"key":23,"text":88,"correct":21},"施工过程中人为过失而造成的时间消耗",{"key":26,"text":90,"correct":28},"与施工工艺特点有关的工作中断时间",{"key":30,"text":92,"correct":21},"劳动组织不当引起的时间消耗",{"id":94,"libraryId":5,"type":9,"typeLabel":15,"stem":95,"options":96,"answer":26,"analysis":32},1167437,"典型定额法包括（ ）。",[97,99,101,103],{"key":19,"text":98,"correct":21},"写实记录法",{"key":23,"text":100,"correct":21},"工作日写实法",{"key":26,"text":102,"correct":28},"比例数式法",{"key":30,"text":104,"correct":21},"简易测定法",{"id":106,"libraryId":5,"type":9,"typeLabel":15,"stem":107,"options":108,"answer":26,"analysis":32},1167438,"关于比较类推法，以下说法错误的是（ ）。",[109,110,112,114],{"key":19,"text":62,"correct":21},{"key":23,"text":111,"correct":21},"工作量小",{"key":26,"text":113,"correct":28},"适用于批量大的施工作业",{"key":30,"text":115,"correct":21},"需要测定比例关系",{"id":117,"libraryId":5,"type":9,"typeLabel":15,"stem":118,"options":119,"answer":19,"analysis":32},1167439,"以下（ ）属于有效工作时间。",[120,122,123,125],{"key":19,"text":121,"correct":28},"辅助工作时间",{"key":23,"text":52,"correct":21},{"key":26,"text":124,"correct":21},"不可避免的中断时间",{"key":30,"text":54,"correct":21},{"id":127,"libraryId":5,"type":9,"typeLabel":15,"stem":128,"options":129,"answer":30,"analysis":32},1167440,"工人在工作班内消耗的工作时间，按其消耗的性质可以分为（ ）。",[130,132,134,136],{"key":19,"text":131,"correct":21},"定额时间和休息时间",{"key":23,"text":133,"correct":21},"有效时间和损失时间",{"key":26,"text":135,"correct":21},"必须消耗的时间和中断时间",{"key":30,"text":137,"correct":28},"必须消耗的时间和损失时间",{"id":139,"libraryId":5,"type":9,"typeLabel":15,"stem":140,"options":141,"answer":30,"analysis":32},1167441,"劳动定额的表现形式分为（ ）。",[142,144,146,148],{"key":19,"text":143,"correct":21},"时间定额和技术定额",{"key":23,"text":145,"correct":21},"技术定额和经济定额",{"key":26,"text":147,"correct":21},"经济定额和产量定额",{"key":30,"text":149,"correct":28},"产量定额和时间定额",{"id":151,"libraryId":5,"type":9,"typeLabel":15,"stem":152,"options":153,"answer":23,"analysis":32},1167442,"工人在工作班内消耗的工作时间，按其消耗的性质，可以分为两大类：（ ）。",[154,156,157,159],{"key":19,"text":155,"correct":21},"有效工作时间和停工时间",{"key":23,"text":137,"correct":28},{"key":26,"text":158,"correct":21},"必须消耗的时间和休息时间",{"key":30,"text":160,"correct":21},"必须消耗的时间和停工时间",{"id":162,"libraryId":5,"type":9,"typeLabel":15,"stem":163,"options":164,"answer":23,"analysis":32},1167443,"以下（ ）不是按使用范围分类的。",[165,167,169,171],{"key":19,"text":166,"correct":21},"施工定额",{"key":23,"text":168,"correct":28},"企业定额",{"key":26,"text":170,"correct":21},"概算定额",{"key":30,"text":172,"correct":21},"投资估算指标",{"id":174,"libraryId":5,"type":9,"typeLabel":15,"stem":175,"options":176,"answer":23,"analysis":32},1167444,"从施工组织的角度看，（ ）是组成施工过程的基本单元。",[177,179,181,183],{"key":19,"text":178,"correct":21},"工序过程",{"key":23,"text":180,"correct":28},"工作过程",{"key":26,"text":182,"correct":21},"工序过程和工作过程",{"key":30,"text":184,"correct":21},"综合工作过程",{"id":186,"libraryId":5,"type":9,"typeLabel":15,"stem":187,"options":188,"answer":30,"analysis":32},1167445,"按定额标定的对象不同，劳动定额又分为单项工序定额、综合定额。下表为砖基础砌体劳动定额（计量单位：m）。 根据上表，厚度1.5砖的综合产量定额为（ ）。",[189,191,193,195],{"key":19,"text":190,"correct":21},"2.34m3",{"key":23,"text":192,"correct":21},"0.86m3",{"key":26,"text":194,"correct":21},"1.2m3",{"key":30,"text":196,"correct":28},"1.16m3",{"id":198,"libraryId":5,"type":9,"typeLabel":15,"stem":199,"options":200,"answer":30,"analysis":32},1167446,"按定额标定的对象不同，劳动定额又分为单项工序定额、综合定额。下表为砖基础砌体劳动定额（计量单位：m）。 根据上表，厚度1砖的综合时间定额为（ ）。",[201,203,205,207],{"key":19,"text":202,"correct":21},"427工日",{"key":23,"text":204,"correct":21},"0.86工日",{"key":26,"text":206,"correct":21},"0.336工日",{"key":30,"text":208,"correct":28},"89工日",{"id":210,"libraryId":5,"type":9,"typeLabel":15,"stem":211,"options":212,"answer":23,"analysis":32},1167447,"按定额标定的对象不同，劳动定额又分为单项工序定额、综合定额。下表为砖基础砌体劳动定额（计量单位：m）。 根据上表，厚度1.5砖的综合时间定额为（ ）。",[213,215,216,217],{"key":19,"text":214,"correct":21},"0.427工日",{"key":23,"text":204,"correct":28},{"key":26,"text":206,"correct":21},{"key":30,"text":218,"correct":21},"0.88工日",{"id":220,"libraryId":5,"type":9,"typeLabel":15,"stem":221,"options":222,"answer":19,"analysis":32},1167448,"劳动定额按其表现形式不同，分为（ ）。",[223,225,227,229],{"key":19,"text":224,"correct":28},"时间定额和产量定额",{"key":23,"text":226,"correct":21},"时间定额和预算定额",{"key":26,"text":228,"correct":21},"施工定额和产量定额",{"key":30,"text":230,"correct":21},"施工定额和预算定额",{"id":232,"libraryId":5,"type":9,"typeLabel":15,"stem":233,"options":234,"answer":30,"analysis":32},1167449,"以下（ ）不属于工程建设定额的分类方法。",[235,237,239,241],{"key":19,"text":236,"correct":21},"按管理权限分类",{"key":23,"text":238,"correct":21},"按生产要素分类",{"key":26,"text":240,"correct":21},"按使用范围分类",{"key":30,"text":242,"correct":28},"按使用年限分类",{"id":244,"libraryId":5,"type":9,"typeLabel":15,"stem":245,"options":246,"answer":23,"analysis":32},1167450,"有效工作时间包括基本工作时间、辅助工作时间和（ ）。",[247,249,251,252],{"key":19,"text":248,"correct":21},"必要的休息时间",{"key":23,"text":250,"correct":28},"准备与结束工作时间",{"key":26,"text":124,"correct":21},{"key":30,"text":253,"correct":21},"偶然的损失时间",{"id":255,"libraryId":5,"type":9,"typeLabel":15,"stem":256,"options":257,"answer":30,"analysis":32},1167451,"以下方法中不属于技术测定法的是：（ ）。",[258,259,260,261],{"key":19,"text":98,"correct":21},{"key":23,"text":100,"correct":21},{"key":26,"text":104,"correct":21},{"key":30,"text":102,"correct":28},{"id":263,"libraryId":5,"type":9,"typeLabel":15,"stem":264,"options":265,"answer":19,"analysis":32},1167452,"在下列各项中，可以在工作时间定额中适当考虑的是（ ）。",[266,268,270,272],{"key":19,"text":267,"correct":28},"由于气候条件而引起的停工时间",{"key":23,"text":269,"correct":21},"由于工人在工作时间聊天而造成的工时损失",{"key":26,"text":271,"correct":21},"由于工人迟到早退而造成的工时损失",{"key":30,"text":273,"correct":21},"由于工人擅自离开工作岗位而引起的停工时间",{"id":275,"libraryId":5,"type":9,"typeLabel":15,"stem":276,"options":277,"answer":26,"analysis":32},1167453,"以下过程不属于按施工过程组织的复杂程度分类的是：（ ）。",[278,279,280,282],{"key":19,"text":178,"correct":21},{"key":23,"text":180,"correct":21},{"key":26,"text":281,"correct":28},"个人完成的过程",{"key":30,"text":184,"correct":21},{"id":284,"libraryId":5,"type":9,"typeLabel":15,"stem":285,"options":286,"answer":23,"analysis":32},1167454,"时间研究是在一定的标准测定条件下，确定人们完成作业活动所需时间总量的一套（ ）。",[287,289,291,293],{"key":19,"text":288,"correct":21},"动作和方法",{"key":23,"text":290,"correct":28},"程序和方法",{"key":26,"text":292,"correct":21},"流程和定额",{"key":30,"text":294,"correct":21},"数据统计表",{"id":296,"libraryId":5,"type":9,"typeLabel":15,"stem":297,"options":298,"answer":23,"analysis":32},1167455,"按施工过程（ ）不同分类，可以分为个人完成的过程、工人班组完成的过程和施工队完成的过程。",[299,301,303,305],{"key":19,"text":300,"correct":21},"完成方法",{"key":23,"text":302,"correct":28},"劳动分工的特点",{"key":26,"text":304,"correct":21},"组织上复杂程度",{"key":30,"text":306,"correct":21},"劳动组织的难易程度",{"id":308,"libraryId":5,"type":9,"typeLabel":15,"stem":309,"options":310,"answer":19,"analysis":32},1167456,"劳动力需求计划的编制程序第一步是（ ）。",[311,313,315,317],{"key":19,"text":312,"correct":28},"确定劳动效率",{"key":23,"text":314,"correct":21},"确定劳动力投人量",{"key":26,"text":316,"correct":21},"确定劳动组合",{"key":30,"text":318,"correct":21},"确定投人强度",{"id":320,"libraryId":5,"type":9,"typeLabel":15,"stem":321,"options":322,"answer":30,"analysis":32},1167457,"关于培训需求的阶段分析，下列说法正确的是（ ）。",[323,325,327,329],{"key":19,"text":324,"correct":21},"是对目前培训需求分析",{"key":23,"text":326,"correct":21},"是对未来培训需求分析",{"key":26,"text":328,"correct":21},"是对正在进行的培训需求分析",{"key":30,"text":330,"correct":28},"主要有目前培训需求分析及未来培训需求分析两种",{"id":332,"libraryId":5,"type":9,"typeLabel":15,"stem":333,"options":334,"answer":23,"analysis":32},1167458,"编制劳务用工需求量计划应该在（ ）阶段。",[335,337,339,341],{"key":19,"text":336,"correct":21},"决策",{"key":23,"text":338,"correct":28},"施工前准备",{"key":26,"text":340,"correct":21},"施工",{"key":30,"text":342,"correct":21},"投标",{"id":344,"libraryId":5,"type":9,"typeLabel":15,"stem":345,"options":346,"answer":23,"analysis":32},1167459,"培训需求的阶段分析是指（ ）的培训需求分析。",[347,349,351,353],{"key":19,"text":348,"correct":21},"基础阶段和提高阶段",{"key":23,"text":350,"correct":28},"目前阶段和未来阶段",{"key":26,"text":352,"correct":21},"学历阶段和职业阶段",{"key":30,"text":354,"correct":21},"常规阶段和继续教育阶段",{"id":356,"libraryId":5,"type":9,"typeLabel":15,"stem":357,"options":358,"answer":23,"analysis":32},1167460,"按工期进度要求及实际劳务人员需求量，以（ ）为单位，编制项目部劳务人员需求计划表。",[359,361,363,365],{"key":19,"text":360,"correct":21},"时间",{"key":23,"text":362,"correct":28},"施工部位",{"key":26,"text":364,"correct":21},"工程项目",{"key":30,"text":366,"correct":21},"劳务队伍",{"id":368,"libraryId":5,"type":9,"typeLabel":15,"stem":369,"options":370,"answer":23,"analysis":32},1167461,"劳务培训计划的编制原则不包括（ ）。",[371,373,375,377],{"key":19,"text":372,"correct":21},"理论与实践相结合的原则",{"key":23,"text":374,"correct":28},"注重全程性原则",{"key":26,"text":376,"correct":21},"培训与提高相结合的原则",{"key":30,"text":378,"correct":21},"人格素质培训与专业素质相结合",{"id":380,"libraryId":5,"type":9,"typeLabel":15,"stem":381,"options":382,"answer":30,"analysis":32},1167462,"目前建筑业务工人员培训的内容不包括（ ）。",[383,385,387,389],{"key":19,"text":384,"correct":21},"安全生产常识",{"key":23,"text":386,"correct":21},"职业基础知识和岗位操作技能",{"key":26,"text":388,"correct":21},"普法维权知识",{"key":30,"text":390,"correct":28},"个人创业知识",{"id":392,"libraryId":5,"type":9,"typeLabel":15,"stem":393,"options":394,"answer":30,"analysis":32},1167463,"劳务管理计划的内容不包括（ ）。",[395,397,399,401],{"key":19,"text":396,"correct":21},"人员配置计划",{"key":23,"text":398,"correct":21},"教育培训计划",{"key":26,"text":400,"correct":21},"考核计划",{"key":30,"text":402,"correct":28},"奖罚计划",{"id":404,"libraryId":5,"type":9,"typeLabel":15,"stem":405,"options":406,"answer":23,"analysis":32},1167464,"主要确定企业的各个工程项目范围内的培训需求属于（ ）层次分析。",[407,409,410,412],{"key":19,"text":408,"correct":21},"企业",{"key":23,"text":364,"correct":28},{"key":26,"text":411,"correct":21},"工作岗位",{"key":30,"text":413,"correct":21},"项目部",{"id":415,"libraryId":5,"type":9,"typeLabel":15,"stem":416,"options":417,"answer":26,"analysis":32},1167465,"劳动力负荷曲线是（ ）的包络曲线。",[418,420,422,424],{"key":19,"text":419,"correct":21},"劳动力动员排列图",{"key":23,"text":421,"correct":21},"劳动力动员横道图",{"key":26,"text":423,"correct":28},"劳动力动员直方图",{"key":30,"text":425,"correct":21},"劳动力动员网络图",{"id":427,"libraryId":5,"type":9,"typeLabel":15,"stem":428,"options":429,"answer":30,"analysis":32},1167466,"劳动力需求量计划还应包括对现场其他人员的使用计划，现场其他人员是指（ ）。",[430,432,434,436],{"key":19,"text":431,"correct":21},"总包单位现场管理人员",{"key":23,"text":433,"correct":21},"专业分包单位现场管理人员",{"key":26,"text":435,"correct":21},"施工劳务单位现场管理人员",{"key":30,"text":437,"correct":28},"工地警卫、勤杂人员",{"id":439,"libraryId":5,"type":9,"typeLabel":15,"stem":440,"options":441,"answer":19,"analysis":32},1167467,"总承包企业的（ ），根据自有劳动力数量，进行劳动力平衡，确定缺口量，提出解决途径。",[442,444,446,448],{"key":19,"text":443,"correct":28},"劳务主管部门",{"key":23,"text":445,"correct":21},"人力资源部门",{"key":26,"text":447,"correct":21},"工程部",{"key":30,"text":449,"correct":21},"员工个人",{"id":451,"libraryId":5,"type":9,"typeLabel":15,"stem":452,"options":453,"answer":30,"analysis":32},1167468,"找差距一般包含三个环节，关于这三个环节下列说法错误的是（ ）。",[454,456,458,460],{"key":19,"text":455,"correct":21},"一是必须对所需要的知识、技能、能力进行分析",{"key":23,"text":457,"correct":21},"二是必须对现实缺少的知识、技能、能力进行分析",{"key":26,"text":459,"correct":21},"三是必须对所需要的知识，技能、能力与现有的知识、技能、能力之间的差距进行分析",{"key":30,"text":461,"correct":28},"这三个环节没有顺序关系，但必须全部进行，以保证分析的有效性",{"id":463,"libraryId":5,"type":9,"typeLabel":15,"stem":464,"options":465,"answer":30,"analysis":32},1167469,"下列各项中，不属于建筑业务工人员培训形式的是（ ）。",[466,468,470,472],{"key":19,"text":467,"correct":21},"现场入场教育和日常教育",{"key":23,"text":469,"correct":21},"农民工夜校",{"key":26,"text":471,"correct":21},"技术大比武活动",{"key":30,"text":473,"correct":28},"脱产学历教育",{"id":475,"libraryId":5,"type":9,"typeLabel":15,"stem":476,"options":477,"answer":23,"analysis":32},1167470,"某工程队有建安工人300人，月计划完成施工产值3750000元，百元产值工资系数为14％，计划工人劳动生产率为（ ）元\u002F人。",[478,480,482,484],{"key":19,"text":479,"correct":21},"1750",{"key":23,"text":481,"correct":28},"12500",{"key":26,"text":483,"correct":21},"13000",{"key":30,"text":485,"correct":21},"52500",{"id":487,"libraryId":5,"type":9,"typeLabel":15,"stem":488,"options":489,"answer":19,"analysis":32},1167471,"下列各项中，不属于劳动力需求计划编制原则的是（ ）。",[490,492,494,496],{"key":19,"text":491,"correct":28},"保障劳动力权益的原则",{"key":23,"text":493,"correct":21},"劳动力资源优化配置的原则",{"key":26,"text":495,"correct":21},"符合施工组织设计的原则",{"key":30,"text":497,"correct":21},"确保工程质量、安全生产和工程进度的原则",{"id":499,"libraryId":5,"type":9,"typeLabel":15,"stem":500,"options":501,"answer":19,"analysis":32},1167472,"从培训的三方面内容，即（ ）看，三者必须兼备，缺一不可。",[502,504,506,508],{"key":19,"text":503,"correct":28},"知识、技能和态度",{"key":23,"text":505,"correct":21},"知识、技能和素质",{"key":26,"text":507,"correct":21},"知识、道德和态度",{"key":30,"text":509,"correct":21},"素质、技能和态度",{"id":511,"libraryId":5,"type":9,"typeLabel":15,"stem":512,"options":513,"answer":19,"analysis":32},1167473,"劳务用工数量和工种需求量的预测要围绕工程项目的工期、施工部位和（ ）。",[514,516,518,520],{"key":19,"text":515,"correct":28},"工程量",{"key":23,"text":517,"correct":21},"劳务分包合同",{"key":26,"text":519,"correct":21},"施工技术方案",{"key":30,"text":521,"correct":21},"材料供应状态",{"id":523,"libraryId":5,"type":9,"typeLabel":15,"stem":524,"options":525,"answer":26,"analysis":32},1167474,"某工程队有建安工人300人，月计划完成施工产值3750000元，百元产值工资系数为14%，则计划工人劳动生产率为（ ）元\u002F人。",[526,528,530,531],{"key":19,"text":527,"correct":21},"10500",{"key":23,"text":529,"correct":21},"11500",{"key":26,"text":481,"correct":28},{"key":30,"text":532,"correct":21},"13500",{"id":534,"libraryId":5,"type":9,"typeLabel":15,"stem":535,"options":536,"answer":19,"analysis":32},1167475,"培训时要积极发挥学员的主观能动性，强调学员的参与意识，是由（ ）则决定的。",[537,539,540,542],{"key":19,"text":538,"correct":28},"理论与实践相结合",{"key":23,"text":376,"correct":21},{"key":26,"text":541,"correct":21},"职业道德培训与专业素质相结合",{"key":30,"text":543,"correct":21},"人员培训与企业文化相适应",{"id":545,"libraryId":5,"type":9,"typeLabel":15,"stem":546,"options":547,"answer":30,"analysis":32},1167476,"劳动力的需求，要求项目部以（ ）进行申报。",[548,550,552,554],{"key":19,"text":549,"correct":21},"口头表达的形式向公司劳务主管部门",{"key":23,"text":551,"correct":21},"书面的形式向公司人事主管部门",{"key":26,"text":553,"correct":21},"表格的形式向公司安全主管部门",{"key":30,"text":555,"correct":28},"表格的形式向公司劳务主管部门",{"id":557,"libraryId":5,"type":9,"typeLabel":15,"stem":558,"options":559,"answer":26,"analysis":32},1167477,"关于劳务管理计划的目标的确定，说法正确的是：（ ）。",[560,562,564,566],{"key":19,"text":561,"correct":21},"劳务管理的目标只确定总目标",{"key":23,"text":563,"correct":21},"劳务管理的目标不应将总目标和分目标分别设置",{"key":26,"text":565,"correct":28},"劳务管理的目标应分为总目标和分目标",{"key":30,"text":567,"correct":21},"劳务管理的目标只设置分目标",{"id":569,"libraryId":5,"type":9,"typeLabel":15,"stem":570,"options":571,"answer":23,"analysis":32},1167478,"某工程承包作业5000㎡，计划每平方米单位用工5个工日，每个工日单价40元，计划工期为306天，计划劳动生产率指数为120％。计划平均人数为（ ）。（保留整数）",[572,574,576,578],{"key":19,"text":573,"correct":21},"80",{"key":23,"text":575,"correct":28},"82",{"key":26,"text":577,"correct":21},"90",{"key":30,"text":579,"correct":21},"100",{"id":581,"libraryId":5,"type":9,"typeLabel":15,"stem":582,"options":583,"answer":23,"analysis":32},1167479,"目前，建筑业劳务培训主要围绕（ ）个关键工种开展。",[584,586,588,590],{"key":19,"text":585,"correct":21},"13",{"key":23,"text":587,"correct":28},"14",{"key":26,"text":589,"correct":21},"15",{"key":30,"text":591,"correct":21},"18",{"id":593,"libraryId":5,"type":9,"typeLabel":15,"stem":594,"options":595,"answer":23,"analysis":32},1167480,"劳动效率可以在《建设工程劳动定额》中直接查到，它代表（ ）的劳动效率。",[596,598,600,602],{"key":19,"text":597,"correct":21},"社会平均水平",{"key":23,"text":599,"correct":28},"社会平均先进水平",{"key":26,"text":601,"correct":21},"该企业平均水平",{"key":30,"text":603,"correct":21},"该企业先进水平",[605,608,611,614,617,620],{"id":9,"name":606,"category":7,"favorite":607},"领导干部任职前廉政法规知识测试题",92,{"id":609,"name":610,"category":7,"favorite":9},595,"建筑结构与设备",{"id":612,"name":613,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":615,"name":616,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":618,"name":619,"category":7,"favorite":8},534,"BIM工程师",{"id":621,"name":619,"category":7,"favorite":8},535]