[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1168431":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1168431,830,3,"判断题","在编制劳务培训费用预算计划时，需要计算直接费用和间接费用。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"在编制劳务培训费用预算计划时，一般只计算直接发生的费用。",{"id":6,"name":21,"category":22,"favorite":23},"(劳务员)专业管理实务 岗位知识","建筑工程",0]