[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1168404":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1168404,830,3,"判断题","由项目预算部门提供《分包单位工程月度申请单》，由分包单位人员携此单到项目经理部有关领导和部门签署意见，签好后交至预算部门备查。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"由项目预算部门提供《分包单位工程月度申请单》，由分包单位人员携此单到项目经理部有关领导和部门签署意见，签好后交至预算部门备查。如部门提出异议、暂停结算时，应调查落实，如属实则不予办理结算。",{"id":6,"name":21,"category":22,"favorite":23},"(劳务员)专业管理实务 岗位知识","建筑工程",0]