[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1168388":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1168388,830,3,"判断题","承包人要加强劳务费结算管理工作，做到总分包双方底数清晰，避免发生争议和因此引发恶意讨要工资事件。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"劳务费是劳务工人工资支付的来源，相关单位要按月结算。当月完成的工作量应在劳务分包合同专用条款约定的时间内完成结算；劳务分包作业完工并经承包人验收合格之日起28天内向承包人提父完工结算申请单和完整的结算资料，承包人在收到完工结算申请单之日28天内予以审核确认。承包人要加强劳务费结算管理工作，做到总分包双方底数清晰，避免发生争议和因此引发恶意讨要工资事件。",{"id":6,"name":21,"category":22,"favorite":23},"(劳务员)专业管理实务 岗位知识","建筑工程",0]