[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1168370":3},{"question":4,"library":19},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":9},1168370,830,3,"判断题","分包单位索赔、签证事件发生后，分包单位应及时向项目经理部预算部门申报。逾期（或项目经理部根据项目不同情况确定时间）未报，则视为分包单位放弃索赔权利。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,{"id":6,"name":20,"category":21,"favorite":22},"(劳务员)专业管理实务 岗位知识","建筑工程",0]