[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1168338":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1168338,830,3,"判断题","劳务分包签订工程分包合同，则该合同为无效合同。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"劳务分包企业签订工程分包合同，则该合同为无效合同。",{"id":6,"name":21,"category":22,"favorite":23},"(劳务员)专业管理实务 岗位知识","建筑工程",0]