[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1168316":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1168316,830,3,"判断题","承包人将建设工程非法转包.违法分包后，使得劳动关系复杂化。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"承包人将建设工程非法转包.违法分包后，使得劳动关系趋于复杂化。",{"id":6,"name":21,"category":22,"favorite":23},"(劳务员)专业管理实务 岗位知识","建筑工程",0]