[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1168282":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1168282,830,3,"判断题","承包人至迟应于开始工作日期14天前为劳务分包人雇用的劳务作业人员提供必要的膳宿条件和生活环境；膳宿条件和生活环境应达到工程所在地行政管理机关的标准、要求。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"承包人至迟应于开始工作日期7天前为劳务分包人雇用的劳务作业人员提供必要的膳宿条件和生活环境；膳宿条件和生活环境应达到工程所在地行政管理机关的标准、要求。",{"id":6,"name":21,"category":22,"favorite":23},"(劳务员)专业管理实务 岗位知识","建筑工程",0]