[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1168278":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1168278,830,3,"判断题","除合同另有约定外，支付的劳务费应当保障劳务分包队伍每月支付劳务人员基本工资，人均不低于当地最低工资标准，每年年底前做到90％支付。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"月清月结支付的劳务费应当保障劳务分包队伍每月支付劳务人员基本工资人均不低于工程所在地最低工资标准，合同另有约定的按合同约定。不管采用上述何种方式结算支付，每年年底前都要做到100%支付。",{"id":6,"name":21,"category":22,"favorite":23},"(劳务员)专业管理实务 岗位知识","建筑工程",0]