[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1168276":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1168276,830,3,"判断题","发包人、承包人在未签订书面劳务分包合同并备案的情况下，可以先进场施工，在10内将合同订立备案即可。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"发包人、承包人在未签订书面劳务分包合同并备案的情况下不得进场施工。",{"id":6,"name":21,"category":22,"favorite":23},"(劳务员)专业管理实务 岗位知识","建筑工程",0]