[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1168273":3},{"question":4,"library":19},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":9},1168273,830,3,"判断题","劳务分包的项目负责人应常驻劳务作业现场，每月在劳务作业现场时间不得少于专用合同条款约定的天数。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,{"id":6,"name":20,"category":21,"favorite":22},"(劳务员)专业管理实务 岗位知识","建筑工程",0]