[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1168255":3},{"question":4,"library":19},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":9},1168255,830,3,"判断题","对劳务分包队伍的综合评价，可以分为过程综合评价和全面综合评价。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,{"id":6,"name":20,"category":21,"favorite":22},"(劳务员)专业管理实务 岗位知识","建筑工程",0]