[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1168217":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1168217,830,3,"判断题","劳动力需求计划表的样式是固定的，不能更改。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"根据3.1.1劳动力需求计划的编制原则和要求条例：在工程实际中，由于对劳动力需求计划表，国家和行业无统一要求，各企业可根据自身情况有自己的表式。",{"id":6,"name":21,"category":22,"favorite":23},"(劳务员)专业管理实务 岗位知识","建筑工程",0]