[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1168186":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1168186,830,3,"判断题","将一个施工工程分解成一系列工序的目的，是为了分析、研究各工序在施工过程中的必要性和合理性。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"将一个施工工程分解成一系列工序的目的，是为了分析、研究各工序在施工过程中的必要性和合理性。测定每个工序的工时消耗，分析各工序之间的关系及其衔接时间，最后测定工序上的时间消耗标准。",{"id":6,"name":21,"category":22,"favorite":23},"(劳务员)专业管理实务 岗位知识","建筑工程",0]