[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1168140":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1168140,830,2,"多选题","项目部对劳务人员工资表进行核对，经核实无误3天公示后，对确认的工资表分别由（ ）盖章确认。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","工程发包企业",false,{"key":16,"text":17,"correct":14},"B","工程总承包企业",{"key":19,"text":20,"correct":21},"C","劳务发包企业",true,{"key":23,"text":24,"correct":21},"D","劳务分包企业",{"key":26,"text":27,"correct":14},"E","专业承包企业","CD","项目部依据1C智能卡系统记录农民工出勤情况、留存的劳动合同书和所属劳务员跟踪记录的农民工务工情况进行核对，经核实无误后，将工资表在施工现场和农民工生活区公示3天，公示后对确认的工资表分别由劳务分包企业、劳务发包企业盖章确认。",{"id":6,"name":31,"category":32,"favorite":33},"(劳务员)专业管理实务 岗位知识","建筑工程",0]