[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1168135":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1168135,830,2,"多选题","承包人与劳务分包人应当依法签订分包合同，必须明确约定（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","支付劳务工程款的时间",true,{"key":16,"text":17,"correct":14},"B","结算方式",{"key":19,"text":20,"correct":21},"C","工程量计算规则",false,{"key":23,"text":24,"correct":21},"D","结算程序",{"key":26,"text":27,"correct":14},"E","保证按期支付的措施","ABE","承包人与劳务分包人应当依法签订分包合同，必须明确约定支付劳务工程款的时间、结算方式以保证按期支付的措施。按规定只能向劳务分包企业支付劳务工程款，不得向无资质的个体承包人支付，不得以实物或有价证券等形式抵付。",{"id":6,"name":31,"category":32,"favorite":33},"(劳务员)专业管理实务 岗位知识","建筑工程",0]