[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1168130":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1168130,830,2,"多选题","所有（ ）在分包单位工程结算完成后统一支付。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","项目劳务费",false,{"key":16,"text":17,"correct":14},"B","劳务分包工程款项",{"key":19,"text":20,"correct":21},"C","工程索赔费",true,{"key":23,"text":24,"correct":21},"D","工程签证费",{"key":26,"text":27,"correct":14},"E","利润","CD","所有工程索赔、签证费用在分包单位工程结算完成后统一支付。",{"id":6,"name":31,"category":32,"favorite":33},"(劳务员)专业管理实务 岗位知识","建筑工程",0]