[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1168096":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1168096,830,2,"多选题","根据《建设领域农民工工资支付管理暂行办法》，农民工工资纠纷应急处理的原则是（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","先行垫付原则",true,{"key":16,"text":17,"correct":14},"B","优先支付原则",{"key":19,"text":20,"correct":21},"C","事后追究责任原则",false,{"key":23,"text":24,"correct":14},"D","及时裁决和强制执行原则",{"key":26,"text":27,"correct":14},"E","违法分包承担连带责任原则","ABDE","根据《建设领域农民工工资支付管理暂行办法》有以下原则：先行垫付原则、优先支付原则、及时裁决和强制执行原则、违法分包承担连带责任原则。",{"id":6,"name":31,"category":32,"favorite":33},"(劳务员)专业管理实务 岗位知识","建筑工程",0]