[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1168082":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1168082,830,2,"多选题","施工企业要切实加强建筑劳务合同实施过程管理，其措施包括（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","成立劳务分包管理组织机构",true,{"key":16,"text":17,"correct":14},"B","选择劳务协作队伍",{"key":19,"text":20,"correct":14},"C","实行劳务工长负责制",{"key":22,"text":23,"correct":14},"D","确定工程劳务分包单价",{"key":25,"text":26,"correct":27},"E","加强对劳务分包队伍的施工成果管理",false,"ABCD","施工企业加强建筑劳务合同实施过程管理措施：成立劳务分包管理组织机构；选择劳务协作队伍；实行劳务工长负责制；确定工程劳务分包单价；加强对劳务分包队伍的施工过程控制；注重完工总结",{"id":6,"name":31,"category":32,"favorite":33},"(劳务员)专业管理实务 岗位知识","建筑工程",0]