[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1168073":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1168073,830,2,"多选题","发包人、承包人应当在劳务分包合同中明确约定（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","劳务作业验收的时限",true,{"key":16,"text":17,"correct":18},"B","劳务作业验收的内容",false,{"key":20,"text":21,"correct":14},"C","劳务合同价款结算的时限",{"key":23,"text":24,"correct":14},"D","劳务合同价款支付的时限",{"key":26,"text":27,"correct":18},"E","劳务作业的作业量","ACD","发包人、承包人应当在劳务分包合同中明确约定劳务作业验收的时限，以及劳务合同价款结算和支付的时限。",{"id":6,"name":31,"category":32,"favorite":33},"(劳务员)专业管理实务 岗位知识","建筑工程",0]