[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1168004":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1168004,830,2,"多选题","劳动用工相关计算指标主要有（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","计划平均人数",true,{"key":16,"text":17,"correct":14},"B","计划工资总额",{"key":19,"text":20,"correct":14},"C","计划工人劳动生产率",{"key":22,"text":23,"correct":14},"D","劳动定额完成情况",{"key":25,"text":26,"correct":27},"E","计划用工缺口",false,"ABCD","劳动用工相关计算指标主要有：计划平均人数、计划工资总额、计划工人劳动生产率、劳动定额完成情况。",{"id":6,"name":31,"category":32,"favorite":33},"(劳务员)专业管理实务 岗位知识","建筑工程",0]